Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 12, 2026 at 8:00 PM
Updated May 14, 2026
Site work for a power facility in Carpenter, South Dakota. Working plans call for site work for a power facility.
Provide all labor, materials, equipment, transportation, and resources necessary to complete construction of Carpenter Substation, Stage 03. Work includes installation of one 230/115kV transformer bay, rerouting the existing 230kV Watertown #1 transmission line to a new bay position, and installation of one 115kV bay with all associated structures and electrical equipment. Demolition includes removal of one existing 230kV take-off structure and associated foundations. All work shall be completed within 360 days from receipt of Notice to Proceed. Location: Carpenter Substation, South Dakota. The estimated construction magnitude of this project is between $1,000,000 and $5,000,000. All work is to be completed within 360 days from receipt of Notice to Proceed. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Power Plant
$5,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 27, 2026
To Be Determined, Carpenter, SD
Related To This Project
Carpenter, SD
--
Yankton, SD
--
Sioux Falls, SD
Bid Date: May 12 2026
Sioux Falls, SD
Bid Date: May 12 2026
Sioux Falls, SD
Bid Date: May 12 2026
Bryant, SD
Bid Date: May 05 2026
Brookings, SD
Bid Date: May 26 2026
Vermillion, SD
Bid Date: May 12 2026
Rapid City, SD
Bid Date: May 12 2026
Montrose, SD
Bid Date: May 12 2026
Eureka, SD
Bid Date: May 12 2026
Winner, SD
Bid Date: May 06 2026
Spearfish, SD
Bid Date: May 06 2026
Oelrichs, SD
Bid Date: May 12 2026
Oelrichs, SD
Bid Date: May 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
