Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 15, 2026
Site work for a development in Lake in the Hills, Illinois. Conceptual plans call for site work for a development.
The Village of Lake in the Hills seeks the services of a qualified firm to develop a diagnostic and feasibility study for Woods Creek Lake. The Feasibility Study must present the most practical approach for sediment and spoils removal, offer the most economically advantageous methods, outline long-term water quality and recreational benefits, and display environmentally sustainable approaches. Required components include a bathymetric survey, sediment survey and characterization, and aquatic resources delineation (to be completed between 4/1 and 10/31). The selected firm must also provide preliminary and final design plans (30%, 60%, and Final/Ready for Bid), which should include, in collaboration with the Village, clearly outlined routes for construction vehicles and disposal methods/locations. An estimate of probable cost for dredging and necessary restoration (for 2027) including construction engineering costs is required. The consultant will be responsible for handling all necessary permitting and associated fees, which includes permits from McHenry-Lake County Soil Water Conservation District, US Army Corps of Engineers, McHenry County Stormwater Management Ordinance, permits to be issued in-house by the Village, IEPA SWPPP, and IDNR-OWR Floodway Permit. Proposers should provide a narrative explaining their approach specific to Lake in the Hills, a detailed project timeline with key dates, references for relevant work, and must adhere to submission and evaluation requirements as outlined by the Village. No cost proposal is associated with this process; the SOQ is the evaluation document. The Village reserves the right to accept or reject any and all proposals, waive informalities, and may request additional information from short-listed firms. 5/25/2026 Firm questions due via email to tbassuener@lith.org by 12:00 pm (CDT)
Conceptual
Conservation and Development
$4,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 7, 2027
Multiple Locations, Lake in the Hills, IL
Related To This Project
Lake in the Hills, IL
Bid Date: May 12 2026
Lake in the Hills, IL
Bid Date: Jun 02 2026
Lake in the Hills, IL
Bid Date: May 26 2026
Lake in the Hills, IL
Bid Date: Jun 04 2026
Lake in the Hills, IL
Bid Date: Apr 02 2026
Lake in the Hills, IL
Bid Date: Mar 31 2026
Lake in the Hills, IL
Bid Date: Mar 06 2026
Lake in the Hills, IL
Bid Date: Jan 30 2026
Lake in the Hills, IL
Bid Date: Feb 10 2026
Lake in the Hills, IL
Bid Date: Feb 10 2026
Lake in the Hills, IL
Bid Date: Jan 20 2026
Lake in the Hills, IL
Bid Date: Jan 22 2026
Lake in the Hills, IL
Bid Date: Jan 19 2026
Lake in the Hills, IL
Bid Date: Nov 21 2025
Lake in the Hills, IL
Bid Date: Nov 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
