BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 21, 2026 at 8:00 PM

Updated May 22, 2026

Site work and new construction of a fire / police facility in Galt, California. Conceptual plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

Cosumnes Community Services District is seeking architectural and engineering proposals for the Fire Station 46 Annex Building project. Bidders are advised to refer to the RFP for more information. The District has been awarded an $850,000 federal grant to fund the total project, which includes Architectural and Engineering Services, construction, and all soft costs, e.g., permits, inspection, CCSD project management. The purpose of this project is to design and construct a new standalone support building on the Fire Station 46 campus. Based on the District's evaluation of the available site and project funding, the proposed project envisions the construction of a pre-engineered metal building (PEMB) located west of the existing fire station. The new structure will not be connected to the main station, but a breezeway will be built between the two buildings to ensure safe and efficient access for personnel. The PEMB structure will include: o Enclosed storage space for one wildland fire engine o A dedicated PPE (Personal Protective Equipment) storage area o Separate, designated areas for EMS and custodial supply storage o A fully equipped workout room for firefighter fitness and wellness As part of site preparation, the project will require the removal of existing fencing and storage containers, as well as the grading and clearing of existing materials to ensure a stable construction foundation. The new facility will be equipped with electrical power for lighting and climate control systems. The project will not require potable water, sewer, or gas; the building does not require fire suppression. Method of contractor selection has not been determined at this time. Deadline for Questions May 14, 2026

Conceptual

Fire / Police

$2,000,000.00

Public - City

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
448
Active Projects
171
Bidding Soon
3,774
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

June 4, 2027

Project location map

1050 Walnut Ave, Galt, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.