Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2026 at 8:00 PM
Updated May 14, 2026
Renovation of a laboratory facility in Boulder, Colorado. Working plans call for the renovation of a laboratory facility.
The existing Siemens fire alarm system does not meet current GSA facility standards or building code requirements. The system was originally installed in 1999 as a Siemens MXLV multiplex addressable fire alarm system and was partially renovated in 2008 to add dual-channel voice circuits, updated programming, synchronized strobes, speaker strobes, and synchronization modules. The manufacturer no longer supports the field initiating devices and notification appliances, and spare parts are increasingly difficult to obtain, resulting in higher maintenance and repair costs. This project includes the design and installation of a new, complete networked digital addressable fire alarm and emergency voice communication system to restore operational integrity, improve long-term maintenance capability, and reduce the risk of building disruption due to system failure. The work includes installation of a new fire alarm and emergency voice alarm communication system, a new bi-directional amplifier two-way radio communications enhancement system, and a new two-way communication system. The system shall include all wiring, raceways, pull boxes, terminal cabinets, outlet and mounting boxes, control equipment, alarm and supervisory initiating devices, notification appliances, and all accessories and miscellaneous components required for fully operational systems, whether or not each item is specifically described. The fire alarm installation shall also include new digital addressable elevator smoke detection control panels for each elevator machine room, monitored by the base building fire alarm system via alarm, supervisory, and trouble signal contacts. Fire alarm replacement may be phased, subject to design-build phasing plans reviewed and approved by the GSA authority having jurisdiction. Upon acceptance of the new fire alarm system, the contractor shall be responsible for demolition of the existing fire alarm system. The Method of Contractor Selection has not been determined at this Time.
Final Planning
Laboratories
$500,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 13, 2026
325 Broadway, Boulder, CO
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
