Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 15, 2026 at 8:00 PM

Updated July 20, 2026

Renovation of an educational facility in Brockton, Massachusetts. Conceptual plans call for the renovation of a educational facility.

Brockton Public Schools (BPS) is seeking qualifications from experienced, DCAMM-certified design professionals to provide full architectural and engineering design services for the Plouffe Middle School Decarbonization and Energy Efficiency Project. Time Period for Completed Project Six months. Designer Fee Negotiated The project includes the design and engineering of: . Replacement of existing chillers with heat pump chillers; . Replacement of three rooftop units (RTUs) with heat pump RTUs; . Upgrades to the existing Automated Logic WebCTRL Building Management System (BMS); . Necessary mechanical, electrical, structural modifications; and . Design that supports future phases of full building electrification. All work must be performed in accordance with M.G.L. c. 7C, 44 through 58, applicable building codes, energy codes, and BPS standards. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."

Conceptual

Educational

$3,500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
735
Active Projects
367
Bidding Soon
4,896
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2026

December 1, 2026

Project location map

250 Crescent St, Brockton, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed