Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 11, 2026 at 8:00 PM
Updated June 12, 2026
Site work and new construction of a mixed-use development in Wellington, Utah. Completed plans call for the construction of a municipal facility; for site work for a fire / police facility; municipal facility; and fire / police facility.
The scope of work is for the construction of the Wellington City Administration and Public Safety Building. Bids for the construction of the project will be received at Jones & DeMille Engineering, 1675 South Highway 10, Price, Utah 84501. Questions related to the bidding documents must be submitted in writing to the Project Manager with a courtesy copy as specified. Attendance at the pre-bid conference is encouraged but not required. It is the vendor's responsibility to review the entire solicitation to ensure compliance with all requirements. Questions: Questions are due in writing to Wyatt Hansen, Project Manager, at wyatt.h@jonesanddemille.com, on or before Friday, May 29, 2026, by 5:00 PM, with a courtesy copy to trasie.m@jonesanddemille.com. The Project includes the following Work: Wellington City is seeking sealed lump sum bids for construction of Wellington City Administration and Public Safety Building. Project consists of approximately 18,450 SF of new construction and remodel work across three interconnected structures. Project is designed per 2021 IBC under mixed occupancy classification of A-3, B, and S-1, fully sprinklered per IBC Construction Type VB. New City Office and Police Department (approximately 7,600 SF): This new single-story wood-framed building houses City Administration offices, City Council Chambers, and a Police Department. City Council Room features tall ceilings with moveable partitions for multi-use occupancy, elevated council chambers, and custom millwork. Police Department includes secure evidence storage, interview rooms, reception, and a dedicated break room. Exterior facade incorporates natural stone sourced from local Wellington supplier. New PEMB Fire Apparatus Bay (approximately 3,950 SF): New Pre-Engineered Metal Building (PEMB) apparatus bay is configured as a pull-through design to accommodate ladder truck and additional firefighting vehicles. The PEMB is to be procured and installed by General Contractor under this contract. JDE will provide foundation design based on reactions supplied by PEMB manufacturer following contractor procurement. Existing Fire Station Remodel (approximately 6,900 SF): Existing fire station will receive comprehensive remodel including fire bays, Fire Chief's office, training rooms, decontamination and bunker gear areas, laundry facilities, and open office space. Existing open web steel joists remain in place and will receive new metal roof deck and membrane roofing system. Most HVAC equipment is rooftop mounted. A fire riser room with full fire sprinkler system is included. Fire station must remain fully operational throughout construction. Contractor will be required to coordinate a detailed construction schedule with Owner so fire department can manage and relocate equipment within facility during active remodel phases. .Site Work and Civil: Site work includes concrete sidewalks, curb and gutter, pedestrian ramps, HMA paving, pavement marking, landscaping, irrigation, and signage. A digital marquee sign is included in site scope. All utilities are at or near site and early coordination with utility providers is strongly encouraged. Wellington City will furnish material for temporary chain link security fence around project site for duration of construction. Contractor is responsible for fence maintenance and providing any additional temporary fencing required for site security or safety
Post-Bid
Municipal
$5,820,745.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2026
August 10, 2026
150 W Main St, Wellington, UT
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
