BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a sidewalk / parking lot in South Jordan, Utah. Completed plans call for site work for a sidewalk / parking lot.

Question Deadline 05/11/2026 at 12:00 PM MT The City of South Jordan seeks a qualified and experienced contractor to furnish and install colored exposed aggregate concrete work in the Towne Center Plaza. The work includes construction of exposed aggregate concrete at Towne Center Drive, installation of truncated dome panels for ADA accessible ramps, landscape curbing (tree wells), and the furnishing and installation of bollards. Coordination with City staff is necessary, as they are responsible for site preparation and the installation of untreated base course. An alternative portion of work is the furnishing and installation of curb and gutter, and removal of curb and gutter sections as indicated in the plans, at the same location. Contractors must thoroughly review all requirements, standards, and specifications, and submit all required documents and information online through Bonfire. Questions must be submitted only through the Bonfire Q&A function. The City will award the base bid to the lowest bidder, and the alternative bid only if budget allows. The City may also reject any bid at its sole discretion.

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - City

Site Work

11

8

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

July 1, 2026

Project location map

1655 W Towne Center Dr, South Jordan, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.