BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2026 at 8:00 PM

Updated May 21, 2026

Site work, paving and new construction of a playground / park / athletic field in Saranac Lake, New York. Completed plans call civil work for a playground / park / athletic field.

The Department hereby establishes an overall goal of 6% for SDVOB participation, For purposes of this procurement, the Department hereby establishes an overall goal of 30% for Minority and Women-Owned Business Enterprises (MWBE) participation, (based on the current availability of qualified MBEs and WBEs). The Fish Creek Pond Multi-Use Trail Project consists of the rehabilitation and asphalt resurfacing of approximately 3.0 miles of existing multi-use trail located within the Fish Creek Pond Campground. The project is intended to improve accessibility, enhance visitor safety, and encourage non-motorized recreational use by providing a durable and accessible trail surface separated from adjacent campground roadways. The rehabilitated trail will generally consist of an 8-foot-wide asphalt surface with 6 inches of compacted subbase and 1.5-foot-wide compacted gravel shoulders on each side. The trail will be constructed to maintain a maximum cross slope of 2 percent and a maximum running slope of 10 percent in accordance with applicable accessibility requirements. Estimated to be between $1,050,000 and $1,170,000 for General Construction. Furnish all labor, materials, equipment and supervision necessary for the construction of an approximately 3.25-mile, 8-foot wide asphalt multi-use trail. Work includes, but not limited to; clearing and grubbing, earthwork, underground utility location, subbase placement and compaction, asphalt placement, erosion and sediment controls, trail signage and pavement marking. This project involves furnishing all labor, materials, equipment and supervision necessary for the construction of an approximately 3.25-mile, 8-foot wide asphalt multi-use trail. *The value for this project is based on a financial range of $1,050,000 and $1,170,000. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Playgrounds / Parks / Athletic Fields

$1,170,000.00

Public - State/Provincial

New Construction, Paving, Site Work

23

12

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
131
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2026

September 15, 2026

Project location map

4523 State Route 30, Saranac Lake, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.