BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 19, 2026

Site work and renovation of a mixed-use development in Berkeley, California. Completed plans call for the renovation of a educational facility.

The scope of work includes removing old MH30 switchgear and replacing it with new, owner-supplied switchgear, along with installing a new duct bank between MH30 and MH30A. The university will deliver the owner-supplied switchgear to the site. Work scheduling must be approved by the UC Project Manager, with consideration for the Greek Theater concert season and associated blackout dates. Bonds: Bid Bond required (unspecified amount).

GC Bidding

Educational

$600,000.00

Public - State/Provincial

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
477
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2026

July 5, 2026

Project location map

Hearst Field Annex, UC Berkeley Campus, Berkeley, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.