BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Site work, paving and outdoor lighting for a mixed-use development in Eau Claire, Wisconsin. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; water / sewer project; and water / sewer project.

https://www.weau.com/2026/06/08/city-eau-claire-engineering-department-informs-public-upcoming-construction-project/ EAU CLAIRE, Wis. (WEAU) - The City of Eau Claire Engineering Department is informing the public of an upcoming construction project. The construction work is taking place on Cameron Street, Bellinger Street to Madison Street, and Mappa Street, Madison Street to Cameron Street. Work is scheduled to begin June 15, 2026. According to the City of Eau Claire Engineering Department, work will consist of clearing and grubbing, removing the existing asphalt surface, removing curb and gutter, removing driveway approaches, sanitary sewer and service installation, water main and service installation, storm sewer, grading and graveling, new curb and gutter, concrete sidewalk repair, new concrete sidewalk installation, new concrete driveway approaches, new bituminous pavement, epoxy pavement marking, and lawn restoration. -------------------------------------------------- SCOPE OF WORK Gray Street, S Farwell Street to Doty Street. The construction of Gray Street shall consist of removal of bituminous pavement, removal of concrete curb and gutter, removal of concrete driveway approaches, removal of concrete sidewalk, clearing and grubbing, sanitary sewer and services, water main and services, storm sewer, electrical conduit and wiring installation, street light installation, unclassified excavation, preparation of subbase, crushed aggregate base, concrete curb and gutter, concrete pavement, concrete sidewalks, concrete driveway approaches, asphaltic concrete pavement, sawing, lawn restoration and epoxy pavement marking. S Dewey Street, Main Street to E Lake Street. The construction of S Dewey Street shall consist of removal of bituminous pavement, removal of concrete curb and gutter, removal of concrete driveway approaches, removal of concrete sidewalk, clearing and grubbing, sanitary sewer and services, water main and services, storm sewer, electrical conduit and wiring installation, street light installation, unclassified excavation, preparation of subbase, crushed aggregate base, concrete curb and gutter, concrete sidewalks, concrete driveway approaches, asphaltic concrete pavement, sawing, lawn restoration and epoxy pavement marking. Alley East of S Farwell Street, Gray Street to E Lake Street. The construction of the Alley East of S Farwell Street shall consist of removal of bituminous pavement, storm sewer, unclassified excavation, preparation of subbase, crushed aggregate base, asphaltic concrete pavement, sawing, and lawn restoration. Parking Lot, Southeast Corner of Gray Street and S Farwell Street. The construction of the Parking Lot shall consist of removal of bituminous pavement, preparation of subbase, crushed aggregate base, asphaltic concrete pavement, & sawing.Woodland Avenue, Chauncey Street to Margaret Street. The construction of Woodland Avenue shall consist of removal of bituminous pavement, removal of concrete curb and gutter, removal of concrete driveway approaches, removal of concrete sidewalk, clearing and grubbing, sanitary sewer and services, water main and services, storm sewer, unclassified excavation, preparation of subbase, crushed aggregate base, retaining wall construction, concrete curb and gutter, concrete sidewalks, concrete driveway approaches, asphaltic concrete pavement, sawing, and lawn restoration. 1000.3 - TIME OF COMPLETION AND PROJECT SCHEDUL For questions regarding this project contact the Purchasing office, 203 S. Farwell Street, P.O. Box 5148, Eau Claire, WI 54702-5148, telephone (715) 839-4957.

Bid Results

Roads / Highways

$2,323,056.00

Public - City

Outdoor Lighting, Paving, Site Work

29

5

7

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
50
Bidding Soon
1,029
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2026

June 24, 2026

Project location map

Multiple locations, Eau Claire, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.