Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 11, 2026 at 8:00 PM
Updated June 12, 2026
Site work, paving and outdoor lighting for a mixed-use development in Eau Claire, Wisconsin. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; water / sewer project; and water / sewer project.
https://www.weau.com/2026/06/08/city-eau-claire-engineering-department-informs-public-upcoming-construction-project/ EAU CLAIRE, Wis. (WEAU) - The City of Eau Claire Engineering Department is informing the public of an upcoming construction project. The construction work is taking place on Cameron Street, Bellinger Street to Madison Street, and Mappa Street, Madison Street to Cameron Street. Work is scheduled to begin June 15, 2026. According to the City of Eau Claire Engineering Department, work will consist of clearing and grubbing, removing the existing asphalt surface, removing curb and gutter, removing driveway approaches, sanitary sewer and service installation, water main and service installation, storm sewer, grading and graveling, new curb and gutter, concrete sidewalk repair, new concrete sidewalk installation, new concrete driveway approaches, new bituminous pavement, epoxy pavement marking, and lawn restoration. -------------------------------------------------- SCOPE OF WORK Gray Street, S Farwell Street to Doty Street. The construction of Gray Street shall consist of removal of bituminous pavement, removal of concrete curb and gutter, removal of concrete driveway approaches, removal of concrete sidewalk, clearing and grubbing, sanitary sewer and services, water main and services, storm sewer, electrical conduit and wiring installation, street light installation, unclassified excavation, preparation of subbase, crushed aggregate base, concrete curb and gutter, concrete pavement, concrete sidewalks, concrete driveway approaches, asphaltic concrete pavement, sawing, lawn restoration and epoxy pavement marking. S Dewey Street, Main Street to E Lake Street. The construction of S Dewey Street shall consist of removal of bituminous pavement, removal of concrete curb and gutter, removal of concrete driveway approaches, removal of concrete sidewalk, clearing and grubbing, sanitary sewer and services, water main and services, storm sewer, electrical conduit and wiring installation, street light installation, unclassified excavation, preparation of subbase, crushed aggregate base, concrete curb and gutter, concrete sidewalks, concrete driveway approaches, asphaltic concrete pavement, sawing, lawn restoration and epoxy pavement marking. Alley East of S Farwell Street, Gray Street to E Lake Street. The construction of the Alley East of S Farwell Street shall consist of removal of bituminous pavement, storm sewer, unclassified excavation, preparation of subbase, crushed aggregate base, asphaltic concrete pavement, sawing, and lawn restoration. Parking Lot, Southeast Corner of Gray Street and S Farwell Street. The construction of the Parking Lot shall consist of removal of bituminous pavement, preparation of subbase, crushed aggregate base, asphaltic concrete pavement, & sawing.Woodland Avenue, Chauncey Street to Margaret Street. The construction of Woodland Avenue shall consist of removal of bituminous pavement, removal of concrete curb and gutter, removal of concrete driveway approaches, removal of concrete sidewalk, clearing and grubbing, sanitary sewer and services, water main and services, storm sewer, unclassified excavation, preparation of subbase, crushed aggregate base, retaining wall construction, concrete curb and gutter, concrete sidewalks, concrete driveway approaches, asphaltic concrete pavement, sawing, and lawn restoration. 1000.3 - TIME OF COMPLETION AND PROJECT SCHEDUL For questions regarding this project contact the Purchasing office, 203 S. Farwell Street, P.O. Box 5148, Eau Claire, WI 54702-5148, telephone (715) 839-4957.
Bid Results
Roads / Highways
$2,323,056.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2026
June 24, 2026
Multiple locations, Eau Claire, WI
Related To This Project
Eau Claire, WI
Bid Date: Apr 07 2026
Eau Claire, WI
Bid Date: Apr 23 2026
Eau Claire, WI
Bid Date: May 26 2026
Eau Claire, WI
Bid Date: May 22 2026
Eau Claire, WI
Bid Date: Jun 18 2026
Eau Claire, WI
Bid Date: Jun 09 2026
Eau Claire, WI
--
Eau Claire, WI
Bid Date: Jul 07 2026
Eau Claire, WI
Bid Date: Jun 09 2026
Eau Claire, WI
Bid Date: May 21 2026
Eau Claire, WI
Bid Date: Apr 23 2026
Eau Claire, WI
Bid Date: May 07 2026
Eau Claire, WI
Bid Date: May 28 2026
Eau Claire, WI
Bid Date: May 07 2026
Eau Claire, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
