Published June 17, 2026 at 8:00 PM

Updated July 7, 2026

Site work and renovation of a water / sewer project in Coquille, Oregon. Completed plans call civil work for a wastewater treatment plant.

Project includes seismic actuated valves, concrete rehabilitation, and Rink Creek improvements. Schedule A - Seismic Actuated Valves, Schedule B - Concrete Rehabilitation, Schedule C - Rink Creek Improvements Bonds: 10% Bid Bond. The project must be substantially complete October 1, 2026 for Schedule A, October 1, 2026 for Schedule B, and November 1, 2026 for Schedule C after issuance of Notice to Proceed. Schedule A is $350,000 to $550,000; Schedule B is $850,000 to $1,175,000; Schedule C is $635,000 to $960,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 06/10/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. a. Schedule A - Seismic Actuated Valves 1. Installation of a 14-inch seismic actuated valve at Oerding Heights. Work includes piping modifications and associated electrical requirements. Demolition of existing piping. 2. Installation of 10-inch seismic actuated valve at Knowlton Heights Reservoir. Work includes piping modifications and associated electrical requirements. Demolition of existing piping. b. Schedule B - Concrete Rehabilitation 1. Repairs to One (1) Million Gallon Oerding Heights. Work includes surface preparation, demolition of defective concrete, inspection of pre-stressed wire, application of mortar, shotcrete, concrete, and other miscellaneous repair materials. 2. Repairs to One (1) Million Gallon Knowlton Heights Reservoirs. Work includes surface preparation, demolition of defective concrete, inspection of pre-stressed wire, application of mortar, shotcrete, concrete, and other miscellaneous repair materials. 3. Installation of exterior coating and access ladder at Knowlton Heights Reservoir. 4. Repairs to the spillway at Rink Creek Reservoir. Work includes surface preparation, demolition of delaminated concrete, crack and construction joint repair, and application of mortar on interior walls. c. Schedule C - Rink Creek Improvements 1. Removal of approximately 22,000 cubic yards of sediment from the eastern most arm of the Rink Creek Reservoir. 2. Demolition and replacement of the three (3) slide gate valves at the Rink Creek concrete intake structure. 3. Installation of a new floating dock at the Rink Creek concrete intake structure.

Post-Bid

Water / Sewer

$1,175,000.00

Public - City

Renovation, Site Work

24

31

21

7

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
0
Bidding Soon
338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2026

August 17, 2026

Project location map

115 N Birch St, Coquille, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.