BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an educational facility in Johnston, Rhode Island. Completed plans call for the renovation of a educational facility.

Reference Number 0000424839 The roof restoration project consists of the re-coating of the entire existing roof with a polyurethane coating which will provide a 20-year warranty. The existing building was built around 1966 and has an original bituminous roof and a second bituminous one installed crica 1990. There are several leaks at the deteriorated flashing along expansion joints, roof hatches, masonry chimney, skylights, HVAC fans and other roof equipment and elements. The roof area is roughly 97,000 sf of which 20,000 sf is saturated with water and will be replaced with new materials flush to the existing roof layers surface. The existing roof slopes are accomplished with sloped steel structure and consist of: 1. 2-1/2-inch-thick Tectum decking is supported by steel beams and joists, which creates all roof slopes which are 1/8-inch and greater. A pull test was performed and passed for the integrity of Tectum deck. 2. Bituminous built-up roof (BUR) with gravel; some of the gravel is baked into the asphalt and will remain in areas where saturated roof is replaced with new layers, it is impossible to remove it without destroying the fibrous tectum decking. This existing roof layer is de facto an air barrier and will be reclassified as such with AHJ. 3. 2-1/2-inch thick polyisocyanurate insulation. 4. 1/2-inch-thick cover board. 5. Bituminous built-up roof (BUR) with gravel (gravel is scheduled to be 4 vacuumed off). The roof layers will be adhered, and an adhesive pull test for the insulation passed. 6. All above existing roof layers provide R-20 insulation value. 7. All existing skylights except the ones over the gym are to be removed and closed off with new roofing materials. Gym skylights are scheduled to be replaced with new ones. 8. New reglet flashing will be applied at chimney and two small roof parapets and will include limited masonry repointing. Question Acceptance Deadline 05/27/2026 05:00 PM EDT Questions are submitted online No Questions regarding this request for proposals should be directed to Colin McCarthy at colin.mccarthy@collierseng.com Johnston Public Schools reserves the right to reject all bids/proposals in whole or in part or to waive any informality in bidding if it is determined to be in the best interest of the Johnston Public Schools.

Sub-Bidding

Educational

$400,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
966
Active Projects
602
Bidding Soon
5,384
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

June 22, 2026

Project location map

345 Cherry Hill Rd, Johnston, RI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.