Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 25, 2026 at 8:00 PM
Updated May 26, 2026
Renovation of a power facility in Benton, Missouri. Working plans call for the renovation of a power facility.
The work consists of a two-phase design-build effort to replace the existing service elevator at the Harry S. Truman Power Plant. The contractor shall perform all tasks required for design, construction, commissioning, and project closeout, including furnishing all labor, materials, equipment, and services necessary to remove the existing elevator and install a new service-only, industrial-rated elevator with a minimum weight capacity of 4,500 pounds. The new elevator will not be required to meet ADA requirements, and hoist power reliability will be prioritized over speed. Work will be executed under a firm-fixed-price contract and evaluated in accordance with RFO Part 15 procedures. The project includes completion of all associated testing, commissioning, and documentation to deliver a fully functional service elevator system. The estimated period of performance is 540 calendar days from the Notice to Proceed, with an estimated construction magnitude between $1,000,000 and $5,000,000. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Power Plant
$5,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2026
To Be Determined, Benton, MO
Related To This Project
Benton, MO
Bid Date: Jun 08 2026
Benton, MO
Bid Date: Jun 08 2026
Benton, MO
Bid Date: May 21 2026
Benton, MO
Bid Date: Feb 24 2026
Benton, MO
Bid Date: Feb 23 2026
Benton, MO
Bid Date: Nov 26 2025
Benton, MO
Bid Date: Sep 30 2025
Benton, MO
Bid Date: Sep 30 2025
Benton, MO
--
Benton, MO
Bid Date: Aug 11 2025
Benton, MO
Bid Date: Jul 23 2025
Benton, MO
Bid Date: Jun 24 2025
Benton, MO
Bid Date: Feb 19 2025
Benton, MO
Bid Date: Feb 12 2025
Benton, MO
Bid Date: Dec 18 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
