BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 5, 2026 at 8:00 PM

Updated June 6, 2026

Renovation of a military facility in Independence, Missouri. Completed plans call for the renovation of a military facility.

The work consists of removing and replacing the existing asphalt shingle roof surfaces and repairing wood eaves at the Frank Wallace House (approximately 2,414 square feet) and the George Wallace House (approximately 2,200 square feet). Existing roofing materials will be removed, and the roof deck will be examined to identify and mitigate damaged sheathing, moisture, mildew, or rot. Flashing will be inspected and repaired or replaced as necessary. New drip edge and underlayment will be installed, followed by installation of new asphalt shingles. The scope also includes repairing and replacing approximately 30 square feet of wood rot on the soffit and fascia at each home. Replacement wood materials will be primed and painted prior to installation. All work shall be completed in accordance with the project specifications and applicable construction wage rate requirements. PROJECT MAGNITUDE: Between $100,000 and $250,000 The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 07/03/2026 Contractor questions regarding this solicitation will be accepted in writing by email to : bridget_parizek@ios.doi.gov . All questions shall be received no later than 5 calendar days following the organized site visit to be considered .

Sub-Bidding

Military

$250,000.00

Public - Federal

Renovation

3

20

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
83
Bidding Soon
1,249
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2026

August 1, 2026

Project location map

223 N Main St, Independence, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.