Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 12, 2026 at 8:00 PM
Updated June 13, 2026
Demolition, site work and renovation of a detention facility in Fredonia, Kentucky. Completed plans call for the renovation of a detention facility; detention facility; and detention facility.
DOC WKCC Multi Building Roof Replacement This project consists of 5 separate buildings. Scope of work includes the existing shingle removal down to deck and installation of new metal panel roof system of 3 roofs (A, C & E), flute fill and PVC overlay of 1 roof (D), removal and replacement of 1 awning and the demolition of 1 canopy (J). BUILDINGS 'A', 'C' & 'E' 1. Remove existing roofing and underlayment to decking of 3 separate structures (A, C & E). 2. Remove & replace any damaged / deteriorated roof decking of roofs. 3. Remove existing gutters and downspouts on all buildings. 4. Install new ice and water shield at perimeters and penetrations of roofs. 5. Install new underlayment, metal roof panels and components on all roofs. 6. Install new gutters, downspouts, valleys and trim where indicated on drawings. Building 'D' 1. New PVC roofing membrane & "flute filler" rigid insulation installed over existing metal panel roof systems. a. Clean roof surfaces b. Loose lay rigid Isocyanate insulation between roof panel ribs c. Loose lay HD Iso cover board insulation over entire roof d. Mechanically fasten both layers of insulation to existing metal roof structure. e. Mechanically attach .060 PVC membrane roof over insulation. f. Install all PVC flashings and metal components to complete the installation. g. Install new pre-finished gutters and downspouts. BUILDING 'J' 1. Demolish rear canopy structures & front awning structure, install new awning structure in front Question Deadline 06/15/2026 All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Unless otherwise specified in the Solicitation, questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered.
GC Bidding
Jails / Prisons
$740,200.00
Public - State/Provincial
Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 23, 2026
July 1, 2026
374 New Bethel Church Rd, Fredonia, KY
Related To This Project
Fredonia, KY
Bid Date: Jun 12 2026
Fredonia, KY
Bid Date: Dec 18 2025
Fredonia, KY
Bid Date: Sep 16 2025
Fredonia, KY
--
Fredonia, KY
Bid Date: Jun 14 2024
Fredonia, KY
Bid Date: Jun 14 2024
Fredonia, KY
Bid Date: Apr 04 2024
Fredonia, KY
Bid Date: May 01 2024
Fredonia, KY
Bid Date: Oct 26 2023
Fredonia, KY
Bid Date: Jun 23 2022
Florence, KY
Bid Date: May 27 2026
Frankfort, KY
Bid Date: Jun 23 2026
Princeton, KY
Bid Date: Jun 03 2026
Lebanon, KY
Bid Date: Jun 05 2026
Walton, KY
Bid Date: Jun 05 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
