Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 21, 2026 at 8:00 PM
Updated May 22, 2026
Site work and paving for a mixed-use development in Mineral Point, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.
Cth Zz to Lower Wyoming Road The pavement and structure needs treatment to extend their service lives. Perpetuation project to resurface approximately 6.3 miles of STH 23 from CTH ZZ to Lower Wyoming Road in Iowa County. Resurface the roadway, update beam guard as needed, replace or repair culverts as necessary, improve intersection safety at STH 130 and address maintenance needs on B-25-0078. Ten culvert replacements are anticipated. The intersection improvement at STH 23 and STH 130 is anticipated to include adding a dedicated left turn lane from STH 23. The anticipated structure work on B-25-0078, pedestrian structure over STH 23, includes replacement of pedestrian fencing/ railing, applying a methacrylate flood seal to the deck and spot painting associated with fence installation Anticipated Construction Cost: $6,000,000-$6,999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WI DOT - RFP Engineering - Mineral Point - Spring Green *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$6,999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2026
WI-23, Mineral Point, WI
Related To This Project
Mineral Point, WI
Bid Date: Feb 19 2026
Mineral Point, WI
--
Mineral Point, WI
Bid Date: Oct 09 2025
Mineral Point, WI
Bid Date: Sep 04 2025
Mineral Point, WI
--
Mineral Point, WI
--
Mineral Point, WI
--
Mineral Point, WI
--
Mineral Point, WI
Bid Date: Apr 03 2025
Mineral Point, WI
--
Mineral Point, WI
Bid Date: Dec 05 2024
Mineral Point, WI
Bid Date: Nov 12 2024
Mineral Point, WI
Bid Date: Sep 27 2024
Mineral Point, WI
--
Mineral Point, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
