BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 22, 2026 at 8:00 PM

Updated May 23, 2026

Site work and paving for a mixed-use development in Steamboat Springs, Colorado. Conceptual plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000425370 Source ID PU.AG.USA.1644381.C12022576 Piggyback Contract No The City of Steamboat Springs, hereinafter referred to as the City, is soliciting proposals from qualified contractors to provide professional services for site work and landscaping related to the expansion of the Yampa River Botanic Park (YRBP) in Steamboat Springs, Colorado, hereinafter referred to as the Project (Exhibit A). The YRBP's design consultants have prepared an approved bid set for the Project (Appendix A). The contractor will be responsible for providing all materials, labor and equipment necessary to; remove an existing landscape berm, chain-link fencing, asphalt pavement, and trees, install fencing, sidewalk, soft-surface paths, drainage infrastructure, and landscaping, and modify and restripe the existing parking lot in accordance with the Project's plans and specifications. The Project's scheduling, phasing, reclamation, and timely completion is crucial to minimize conflicts with other active projects in Emerald Park and to ensure that all of Emerald Park, including the YRBP, is ready to be reopened in the spring of 2028. The City of Steamboat Springs, hereinafter referred to as the City, is soliciting proposals from qualified contractors to provide professional services for site work and landscaping related to the expansion of the Yampa River Botanic Park (YRBP) in Steamboat Springs, Colorado, hereinafter referred to as the Project (Exhibit A). The YRBP's design consultants have prepared an approved bid set for the Project (Appendix A). The contractor will be responsible for providing all materials, labor and equipment necessary to; remove an existing landscape berm, chain-link fencing, asphalt pavement, and trees, install fencing, sidewalk, soft-surface paths, drainage infrastructure, and landscaping, and modify and restripe the existing parking lot in accordance with the Project's plans and specifications. The Project's scheduling, phasing, reclamation, and timely completion is crucial to minimize conflicts with other active projects in Emerald Park and to ensure that all of Emerald Park, including the YRBP, is ready to be reopened in the spring of 2028. Question Deadline 06/04/2026 at 5:00 PM MT Questions are submitted online Yes General Requirements - Bid Deposit Required - Insurance Required The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."

Conceptual

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
27
Bidding Soon
320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2027

Project location map

1000 Pamela Ln, Steamboat Springs, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.