BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2026 at 8:00 PM

Updated May 28, 2026

Site work and paving for a sidewalk / parking lot in Portage, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000425309 The City of Portage invites interested Contractors to submit a sealed bid for a contract for the provision of preparation, cold milling, paving, restoration and all pavement markings of various city park trails and parking lots. Question Deadline 05/27/2026 at 5:00 PM ET Questions and requests for clarification related to definition or interpretation of this RFB shall be submitted in writing prior to Justin Williams, Purchasing Manager purchasing@portagemi.gov The work generally consists of preparation, cold milling, paving, restoration and all pavement markings Project will consist of trail and parking lot paving including pavement markings. PARKING LOT LOCATIONS -MILL & FILL SPECIFICATIONS a. Schrier Park, 850 W Osterhout Ave (Attachment D) i. 1.5" MILL AND FILL - 5EL PAVEMENT b. South Westnedge Park, 9010 S Westnedge Ave (Attachment E) i. Lower-Level Parking Lot 1.5" Mill and fill -5EL ii. Alternate 1 - 1.5" mill and fill - 5EL iii. Alternate 2 - 1.5" mill & Fill - 5EL iv. Alternate 3 - 1.5" Mill & Fill - 5EL c. Parks and Recreation, 320 Library Lane (Attachment F) i. 1.5" mill & fill - 5EL d. Bicentennial Park 910E Milham Ave (Attachment G) i. 1.5" mill and fill - 5EL, Parking lot and small trails within park e. Alternate -Westfield Park -West parking lot, 4500 W Milham (Attachment K) i. 1.5" mill and fill - 5EL, Parking lot north end 63'x 110' 6. PARK TRAIL LOCATIONS- BUTT JOINTS WITH OVERLAY, MILLING AS SPECIFIED a. PCBP TRAIL - BROWN TO GARDEN LANE - (Attachment H) i. Overlay with butt joints ii. Cold Mill in front of Grain Elevator 102ft x10 ft, 1.5" depth iii. Cold Mill connector from Celery Flats Historical Back parking Lot to trail connection. 202' x 12', 1.5" depth b. PCBP TRAIL - MILHAM TO KILGORE ROAD - (Attachment I) i. Overlay with butt joints 1. Mill full depth for tree roots in two locations per map a. Grade/shape and compact subbase and overlay ii. Four sanitary sewer manhole adjustments 1. Use adjustment rings that fit 1040A type manholes (To be supplied by Contractor) a. Third sanitary sewer manhole is 3" low and holds water. Adjust to prevent ponding of water. Third manhole starting from the south heading north c. Alternate - ELIASON TRAIL CONNECTOR. (Attachment J) i. Base and top to connect trails 1. Grade and compact subbase 2. Install 2" 4EL base and 1.5" top course 5EL

GC Bidding

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
135
Bidding Soon
1,602
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

July 6, 2026

Project location map

Multiple Locations, Portage, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.