Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 22, 2026 at 8:00 PM
Updated May 23, 2026
Site work and paving for a mixed-use development in Mill Creek, Washington. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.
This project reconstructs existing roadways to allow two travel lanes, bike lanes, and curbside parking. Other work includes: replacing curbs and gutters, upgrading curb ramps to current ADA guidelines, constructing sidewalks with tree wells, installing LED pedestrian and street lighting, upgrading storm drainage, and modifying/upgrading traffic signals, including installation of optical fiber and connection to the City of Lynnwood's Traffic Control Center. Phase I of the project reconstructs 236th St SW from the Transit Center through the intersection at 56th Ave W. Phase II reconstructs 56th Ave W from 236th Street SW to 230th Street SW. Phase I was completed in 2021. Phase II is expected to begin construction in 2026. County: Snohomish Agency: Mountlake Terrace Length : 1.000 Begin Termini : 236th St SW at Transit Center End Termini : 56th Ave W/230th St SW As of May 22, 2026, the project is in Final Planning status. Anticipated letting Year is 2026. WADOT - 'Main Street' Reconstruction *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Roads / Highways
$42,677,529.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 3, 2026
Main St, Mill Creek, WA
Related To This Project
Mill Creek, WA
Bid Date: Apr 28 2026
Mill Creek, WA
Bid Date: Apr 30 2026
Mill Creek, WA
Bid Date: Mar 30 2026
Mill Creek, WA
Bid Date: Feb 06 2026
Mill Creek, WA
Bid Date: Jan 05 2026
Mill Creek, WA
Bid Date: Dec 30 2025
Mill Creek, WA
Bid Date: Dec 29 2025
Mill Creek, WA
--
Mill Creek, WA
--
Mill Creek, WA
Bid Date: Jun 04 2026
Mill Creek, WA
Bid Date: Apr 08 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
