BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 4, 2026 at 8:00 PM

Updated June 5, 2026

Remodeling of an educational facility in Heppner, Oregon. Completed plans call for the remodel of a educational facility.

All questions shall be directed in writing to the District's designated contact person for this procurement, Shea White, Project Coordinator at the Wenaha Group, via email sheaw@wenahagroup.com . The District may reject any or all proposals upon a finding it is in the public interest to do so and to rescind the award of any contract at any time before the execution of said contract by all parties with no liability against the District. The District will conduct the procurement in accordance with model rules the Oregon Attorney General has adopted under ORS 279A.065 (3). The Morrow County School District (District) invites written sealed proposals for a Construction Manager/General Contractor (CM/GC) for the remodel of the existing Heppner Jr/Sr High School building to convert it into a new K-12 campus in Heppner, Oregon. Remodel the existing Heppner Jr/Sr High School building into new K-12 campus: remodel the existing occupied Junior/Senior High School to transition the facility into a K-12 campus capable of serving 350 students with intentional student separation by grade levels, including creation of a new auxiliary gymnasium, and improvement to parking and onsite traffic flow. Schematic Design: 09/2026 - 12/2026 Design Development: 12/2026 - 03/2027 Construction Documents: 03/2027 - 06/2027 Bidding and Permitting: 07/2027 - 10/2027 Construction: 02/2028 - 06/2029 Substantial Completion: No later than June 29th, 2029 Final Completion: No later than July 31st, 2029 The projects represent a once in a generation opportunity for the District and, more importantly, for the students and communities the District serves; the District is seeking a Construction Manager/General Contractor (CM/GC) who will collaboratively partner with the District, Wenaha Group, SAJ Architecture and the broader Morrow County community to successfully complete the project in a transparent, team oriented approach. The District expects that representative(s) of the CM/GC will develop and maintain a cooperative team approach with all other parties associated with the projects throughout all phases of the work. June 19th, 2026 @ 2 PM Last Day for submittal of questions at 2:00 PM local time

GC Bidding

Educational

$36,300,000.00

Public - County

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
23
Bidding Soon
394
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2026

February 1, 2028

Project location map

To Be Determined, Heppner, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.