BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 11, 2026

Demolition, site work and renovation of a water / sewer project in Scottsburg, Indiana. Completed plans call for the renovation of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

Repair of storm damage at the Water Treatment Plant --- The work to be performed will include demolition , roof repair / installation , soffit , fascia , gutter and downspout repair / installation , trim , ceiling tile removal and replacement , insulation removal and replacement , HVAC improvements , and all other items mentioned in the contract documents and referenced during the prebid meeting . Roof Replacement -- Remove and properly dispose of the existing roofing system , including all damaged roofing materials , flashing , underlayment , and associated components . Inspect roof decking and structural elements for damage . Notify the Owner of any deficiencies requiring repair prior to installation of new roofing materials . Replace damaged decking as necessary . Install a complete new roofing system , including underlayment , flashing , ridge caps, vents , and all accessories required for a watertight installation . Provide manufacturer's warranties and workmanship warranties upon completion . 2. Air Handler Removal-- Disconnect and remove the existing damaged air handling unit and associated appurtenances as necessary . Properly dispose of removed equipment in accordance with applicable regulations . Coordinate removal activities to minimize disruption to facility operations. Cap, secure, and protect all remaining mechanical, electrical , and control connections until replacement equipment is installed by others or as directed by the Owner . 3. Gutter and Downspout Replacement-- Remove and dispose of all existing damaged gutters , downspouts , hangers, brackets , and associated hardware . Furnish and install new gutters and downspouts matching or exceeding existing capacity . Ensure proper drainage away from the building foundation . Install all required supports , splash blocks , and drainage connections necessary for a complete system . 4. Blower Fan Inspection and Replacement Inspect existing blower fan systems for storm -related damage . Provide documentation of findings to the Owner . Replace blower fan assemblies , motors , controls , mounting hardware , and related components as necessary to restore proper operation . Test and verify operational performance following installation . Interior Restoration - Insulation and Ceiling Systems The Contractor shall remove and replace all insulation and ceiling materials within the following areas : o Blower Room Office Maintenance Room Women's Restroom Men's Restroom Work shall include : Insulation Replacement Remove and dispose of all damaged insulation above ceilings and within affected wall cavities where damage is present . Install new insulation of equivalent or greater thermal performance . Ensure insulation is dry , properly installed , and compliant with applicable building codes. Ceiling Tile Replacement oRemove and dispose of all ceiling tiles . Inspect ceiling grid systems and replace damaged grid components as necessary . Furnish and install new ceiling tiles matching existing style and appearanceas closely as possible . Provide a complete , clean , and uniform finished ceiling system throughout affected areas. Bonds: Certified Check required, 5% Bid Bond. All bid questions shall be directed to Josh Hillman, PE, PLS, via email, at jhillman@dcdevelopco.com.

GC Bidding

Water / Sewer

$1,500,000.00

Public - City

Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
120
Bidding Soon
1,931
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2026

August 24, 2026

Project location map

739 W Lake Road West, Scottsburg, IN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.