Demolition, site work and renovation of a water / sewer project in Scottsburg, Indiana. Completed plans call for the renovation of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.
Repair of storm damage at the Water Treatment Plant --- The work to be performed will include demolition , roof repair / installation , soffit , fascia , gutter and downspout repair / installation , trim , ceiling tile removal and replacement , insulation removal and replacement , HVAC improvements , and all other items mentioned in the contract documents and referenced during the prebid meeting . Roof Replacement -- Remove and properly dispose of the existing roofing system , including all damaged roofing materials , flashing , underlayment , and associated components . Inspect roof decking and structural elements for damage . Notify the Owner of any deficiencies requiring repair prior to installation of new roofing materials . Replace damaged decking as necessary . Install a complete new roofing system , including underlayment , flashing , ridge caps, vents , and all accessories required for a watertight installation . Provide manufacturer's warranties and workmanship warranties upon completion . 2. Air Handler Removal-- Disconnect and remove the existing damaged air handling unit and associated appurtenances as necessary . Properly dispose of removed equipment in accordance with applicable regulations . Coordinate removal activities to minimize disruption to facility operations. Cap, secure, and protect all remaining mechanical, electrical , and control connections until replacement equipment is installed by others or as directed by the Owner . 3. Gutter and Downspout Replacement-- Remove and dispose of all existing damaged gutters , downspouts , hangers, brackets , and associated hardware . Furnish and install new gutters and downspouts matching or exceeding existing capacity . Ensure proper drainage away from the building foundation . Install all required supports , splash blocks , and drainage connections necessary for a complete system . 4. Blower Fan Inspection and Replacement Inspect existing blower fan systems for storm -related damage . Provide documentation of findings to the Owner . Replace blower fan assemblies , motors , controls , mounting hardware , and related components as necessary to restore proper operation . Test and verify operational performance following installation . Interior Restoration - Insulation and Ceiling Systems The Contractor shall remove and replace all insulation and ceiling materials within the following areas : o Blower Room Office Maintenance Room Women's Restroom Men's Restroom Work shall include : Insulation Replacement Remove and dispose of all damaged insulation above ceilings and within affected wall cavities where damage is present . Install new insulation of equivalent or greater thermal performance . Ensure insulation is dry , properly installed , and compliant with applicable building codes. Ceiling Tile Replacement oRemove and dispose of all ceiling tiles . Inspect ceiling grid systems and replace damaged grid components as necessary . Furnish and install new ceiling tiles matching existing style and appearanceas closely as possible . Provide a complete , clean , and uniform finished ceiling system throughout affected areas. Bonds: Certified Check required, 5% Bid Bond. All bid questions shall be directed to Josh Hillman, PE, PLS, via email, at jhillman@dcdevelopco.com.
GC Bidding
Water / Sewer
$1,500,000.00
Public - City
Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2026
August 24, 2026
739 W Lake Road West, Scottsburg, IN
Related To This Project
Scottsburg, IN
--
Scottsburg, IN
--
Scottsburg, IN
Bid Date: Feb 04 2026
Scottsburg, IN
Bid Date: Jan 26 2026
Scottsburg, IN
--
Scottsburg, IN
Bid Date: Oct 21 2025
Scottsburg, IN
Bid Date: Oct 21 2025
Scottsburg, IN
Bid Date: Jul 16 2025
Scottsburg, IN
Bid Date: Jan 14 2026
Scottsburg, IN
Bid Date: Jun 19 2025
Scottsburg, IN
Bid Date: Jan 07 2026
Scottsburg, IN
Bid Date: Feb 03 2025
Scottsburg, IN
--
Scottsburg, IN
--
Scottsburg, IN
Bid Date: Aug 14 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.