BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated June 11, 2026

This is a service / maintenance or supply contract in Redlands, California. Contact the soliciting agency for additional information.

Screening of Concrete/Dirt Stockpile, Concrete Crushing and Stockpiling Set up of equipment and the processing/crushing operation shall be coordinated with the Landfill Manager. The project shall be set up or operated in a location where it shall not interfere with daily operations of the Landfill. Mobilization of Equipment Contractor shall quote a lump sum price to mobilize & demobilize appropriate equipment to screen the existing stockpile of concrete/dirt into various sizes and to crush larger pieces into ¾ inches. This price shall be inclusive of any and all permit, fees and/or rentals needed to stage the equipment at the Landfill. The Landfill operating hours for moving equipment in and out are typically 6:00 a.m. to 2:30 p.m. For the purpose of this Bid item, assume that mobilization/demobilization can take outside of the normal working hours, including on Saturday, provided appropriate arrangements are made in advance with the Landfill Manager. Concrete Stockpile Screening Contractor shall provide a per ton yard rate for the labor and equipment the contractor deems necessary to screen/segregate concrete from the stockpile at the California Street Landfill. Upon further examination it appears that the current stockpile is heterogenous and contains estimated 35% to 45% dirt in and a wide variety of concrete chunk sizes, with and without reinforcing metal. It is expected that the Contractor, upon examination of the current stockpile, will be able to identify the most effective means of processing the stockpile. Explosives and blasting are not permitted in the performance of the pre-processing work. Work shall comply with the Landfill’s Storm Water Pollution Prevention Plan. Residual metal concrete reinforcement materials that are recovered shall be managed by the City of Redlands Landfill staff. The Contractor shall ensure the work area affected by the stockpile screening will not allow ponding of water. Concrete Crushing Concrete pieces regardless of size are to be crushed. Concrete is to be crushed to produce one size of material for use in landfill road building. The Landfill fill desires material that is the following size: • ¾ inches The estimated quantity used for bidding is not a guarantee on the amount of material that is actually on site. The Landfill may, at its discretion based on need and/or available funding, increase or decrease the quantity of material to be produced. Payment will be on a per ton basis. Total tons produced shall be documented by the contractor. The Landfill reserves the right to verify tonnage and quantities via the on-site landfill scales and/or volumetric survey of the final product piles. Daily belt scale tickets are to be provided to the Landfill Manager. The Contractor shall document and certify any material provided under this bid item is not contaminated by nor contains asbestos, asbestos containing materials, solid waste, infectious waste, hazardous waste or construction/demolition material (i.e. wood, shingles, drywall, etc.). The landfill reserves the right to reject any material which may contain the appearance of containing said contaminants. Removal of any rejected material from the Landfill and the appropriate handling/disposition of such materials shall be at the sole expense of the Contractor. Pursuant to and in compliance with your Notice Inviting Bids, and the other documents relating thereto, the undersigned Bidder, having familiarized themselves with the terms of the bid, the local conditions affecting the performance of the work and the cost of the work at the place where the work is to be done, and with the plans thereto, hereby proposes and agrees to perform within the time stipulated, the work, including all of its component parts and everything required to be performed, and to provide and furnish any and all of the labor, materials, tools, equipment and all utility and transportation services necessary to perform the contract.

Sub-Bidding

Water / Sewer

$200,000.00

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
523
Active Projects
256
Bidding Soon
3,868
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2026

August 7, 2026

Project location map

35 Cajon St. Suite 222, Redlands, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.