BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Demolition, site work and addition to an educational facility in Mineral Ridge, Ohio. Completed plans call for the addition of a 2,200-square-foot, one-story above grade educational facility; for site work for a educational facility; and for the demolition of a educational facility.

The Board of Education of the Weathersfield Local School District, Ohio (the "District"), in accordance with Sections 153.65 through 153.72 of the Ohio Revised Code and Ohio Administrative Code 153:1 is using a variety of funds to implement a classroom addition at Seaborn Elementary School. The project will include a 2,200 SF, single story, two (2) classroom addition including all structural mechanical, electrical, technology, casework, amenities and associated support spaces to the existing school. It is hoped that this work will conclude no later than the end of the 2026/2027 school year. The Design Criteria Requirements for this design-build project have been developed by a Criteria Architect/Engineer representing the District and are attached herein. All aspects of this project and related issues will be implemented and operated consistent with the District's policies and procedures. Additionally, all subcontracts will be awarded by the Design-Build Entity (DBE) using a competitive bid process. As such, the District will have access to all books, records, documents, and other data in the DBE's possession related to itself, its subcontractors and material providers pertaining to bidding, pricing or performance of the Agreement. Question Deadline 06/08/2026 at 1:00 PM ET Please submit all questions regarding this RFQ in writing to Steven Haynie haynieste@weathersfield.k12.oh.us with the project name included in the subject line (no phone calls please). The project involves design-build services for an approximately 2,200 total square foot single-story addition to the existing Mineral Ridge Seaborn Elementary School facility.

Post-Bid

Educational

$1,000,000.00

Public - City

Addition, Demolition, Site Work

3

3

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
399
Active Projects
167
Bidding Soon
3,392
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2026

October 12, 2026

Project location map

3800 Niles Carver Rd, Mineral Ridge, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.