BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 7, 2026 at 8:00 PM

Updated June 11, 2026

Site work and paving for a mixed-use development in Bloomington, Indiana. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

City of Bloomington PE Services for College Avenue and Walnut Street Corridor Improvement Project (Des # 2500062) in the Seymour District. This Request for Proposals (RFP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered. Contact for Questions: Neil Kopper, Senior Project Engineer 401 N Morton Street Bloomington, IN 47402 812-349-3593 koppern@bloomington.in.gov Local Public Agency: City of Bloomington Project Description: Project will include multimodal safety and accessibility improvements at multiple locations along College Avenue and Walnut Street between State Road 45/46 and Allen Street. Individual project locations are tentatively expected to include traffic signal replacement and intersection improvements at the intersections of College/11th, College/3rd, College/4th, Walnut/4th, and Walnut/1st; sidewalk construction along the east side of College between 1st Street and 2nd Street; crosswalk improvements at multiple locations including College/Smith, Walnut 19th, and College/Walnut/Old 37; and other similar spot improvements within the corridor. Improvements will be designed to be compatible with the results of an ongoing corridor study to the maximum extent feasible, but are not expected to fully implement the results of that study The corridor study is expected to be complete before detailed design work begins, and consultants should assume that the project's public input is limited to coordination regarding impacts to individual properties. Respondents should assume that some right of way acquisition may be necessary using local funds. Project schedules should be designed to achieve a successful construction letting no later than October 11, 2029. Phases Included: PE Funding: Federal Funding with local match Term of Contract: Until Project Completion The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - PE Services for a New Roundabout at Tiger Drive and River Road

Conceptual

Roads / Highways

$6,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
107
Bidding Soon
1,378
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2027

Project location map

N College Ave & N Walnut St, Bloomington, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.