Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 7, 2026 at 8:00 PM
Updated June 11, 2026
Site work and paving for a mixed-use development in Bloomington, Indiana. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
City of Bloomington PE Services for College Avenue and Walnut Street Corridor Improvement Project (Des # 2500062) in the Seymour District. This Request for Proposals (RFP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered. Contact for Questions: Neil Kopper, Senior Project Engineer 401 N Morton Street Bloomington, IN 47402 812-349-3593 koppern@bloomington.in.gov Local Public Agency: City of Bloomington Project Description: Project will include multimodal safety and accessibility improvements at multiple locations along College Avenue and Walnut Street between State Road 45/46 and Allen Street. Individual project locations are tentatively expected to include traffic signal replacement and intersection improvements at the intersections of College/11th, College/3rd, College/4th, Walnut/4th, and Walnut/1st; sidewalk construction along the east side of College between 1st Street and 2nd Street; crosswalk improvements at multiple locations including College/Smith, Walnut 19th, and College/Walnut/Old 37; and other similar spot improvements within the corridor. Improvements will be designed to be compatible with the results of an ongoing corridor study to the maximum extent feasible, but are not expected to fully implement the results of that study The corridor study is expected to be complete before detailed design work begins, and consultants should assume that the project's public input is limited to coordination regarding impacts to individual properties. Respondents should assume that some right of way acquisition may be necessary using local funds. Project schedules should be designed to achieve a successful construction letting no later than October 11, 2029. Phases Included: PE Funding: Federal Funding with local match Term of Contract: Until Project Completion The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - PE Services for a New Roundabout at Tiger Drive and River Road
Conceptual
Roads / Highways
$6,000,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 29, 2027
N College Ave & N Walnut St, Bloomington, IN
Related To This Project
Bloomington, IN
Bid Date: Jul 17 2026
Bloomington, IN
Bid Date: Jun 26 2026
Bloomington, IN
--
Bloomington, IN
Bid Date: Jun 17 2026
Bloomington, IN
Bid Date: Jun 17 2026
Bloomington, IN
Bid Date: Jun 23 2026
Bloomington, IN
Bid Date: Jun 23 2026
Bloomington, IN
Bid Date: Apr 30 2026
Bloomington, IN
Bid Date: Apr 28 2026
Bloomington, IN
Bid Date: Apr 28 2026
Bloomington, IN
Bid Date: Apr 29 2026
Bloomington, IN
--
Bloomington, IN
Bid Date: Jun 02 2026
Bloomington, IN
Bid Date: Jun 02 2026
Bloomington, IN
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
