BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2026 at 8:00 PM

Updated June 4, 2026

Site work, paving and new construction of a mixed-use development in Mukwonago, Wisconsin. Completed plans call for site work for a playground / park / athletic field; municipal facility; for the construction of a playground / park / athletic field; municipal facility; for paving for a playground / park / athletic field; and municipal facility.

All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. A. In general, the project involves site preparation, utility installation and building construction of a restroom facility. B. The project is located as shown on the Drawings. The Project consists of the site preparation and installation of a bathroom in Lauren Park The project includes grading, erosion control, building pad installation, pavement installation, and building construction. The utilities for the buildings include a water lateral connected to a nearby well and stubbing a sanitary sewer lateral to a septic field to be installed by others. Bids shall be on a lump sum and unit price basis. Site preparation and installation of a restroom at Lauren Park. Bonds: Bid Bond required (unspecified amount), Performance Bond required (unspecified amount).

Post-Bid

Playgrounds / Parks / Athletic Fields

$3,000,000.00

Public - City

New Construction, Paving, Site Work

4

11

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
521
Active Projects
332
Bidding Soon
4,526
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2026

August 3, 2026

Project location map

W320 S8315 Beulah Road, Mukwonago, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.