BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2026 at 8:00 PM

Updated June 3, 2026

Site work, paving and outdoor lighting for a mixed-use development in Green Bay, Wisconsin. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; road / highway; road / highway; for paving for a road / highway; and water / sewer project.

The work under this Contract shall consist of site grading and installation of underground utilities , including storm sewer , sanitary sewer , stormwater management systems , water services , and site restoration necessary to support all project facilities . Key structures include a restroom building and container bar , along with hardscape features such as concrete trails , paver plazas , and a riverfront plaza . Park lighting will be installed throughout the site to provide safety and functionality during evening hours . The project also includes construction of a custom playground , splash pad , dog park (Alternate Bid Item # 1), fitness court , volleyball courts , and an event lawn . Social and entertainment spaces , including the beer garden and container bar , will be integrated with durable site furnishings and landscaping . The work under this Contract includes construction of approximately 130 SY of pavement removal , 450 LF of fence removal , 20,000 SY of topsoil stripping , 3,100 CY of contaminated soil excavation , and 7,700 CY of borrow : 8,200 SY of erosion mat , 2,600 SY of polyethylene sheeting , 90 SY of turbidity barrier , and other erosion control measures ; contractor staking ; 140 LF of 8 - inch sanitary sewer and 317 LF of 6- inch sanitary sewer lateral installation ; 130 LF of 8 -inch storm sewer , 520 LF of 10 - inch storm sewer , 1,080 LF of 12- inch storm sewer , 130 LF of 15 - inch storm sewer , 430 LF of 18 - inch storm sewer , 60 LF of 24 - inch storm sewer , and 155 LF of 6 -inch perforated wrapped underdrain installation ; seven apron endwall installations for 12 - inch and 24 -inch pipe ; storm and sanitary manhole installation ; 212 LF of 4 -inch water main and 28 LF of 6-inch water main installation ; 2,440 TON of CABC , 565 LF of 24 - inch curb and gutter installation ; 25,000 SF of 6-inch concrete sidewalk and driveway ; 40 LF of sidewalk curb retaining wall ; 30 SY of HMA pavement , 8,500 SY of geotextile fabric ; 15,200 LF of conduit installation , including 45,000 LF of wiring , four panelboards , 29 receptacles , 51 light poles , and 87 luminaires ; hauling and disposal of 550 TON of contaminated soil ; 123 SF of concrete stairs ; two wooden platforms ; playground equipment ; volleyball sand and equipment ; splash pad equipment and boulders ; building installation , decorative sheet wall installation , 4,200 SF of pavers ; 2,485 SF of limestone screenings ; 74,650 SF of poured -in-place play surfacing ; guardrails ; site furnishings ; and final restoration . The work under Alternate Bid Item # 1 shall consist of removing base bid materials and amenities and , in lieu thereof , completing earthwork and restoration for the area shown on the drawings and identified as the Dog Park Alternate . The work under Altemate Bid Item # 2 shall consist of furnishing and installing sport court lighting for the volleyball courts .The work under Altemate Bid Item # 3 shall consist of deducting base bid materials in the Upland Area , including native vegetated mat , stabilized limestone screenings , and select boulders . In lieu thereof , lawn seed shall be installed . The work under Alternate Bid Item #4 shall consist of furnishing and installing metal benches , Type 1 receptacles , bike racks , drink ledges , three -top tables , four -top tables , and picnic tables . The work under Altemate Bid Item # 5 shall consist of furnishing and installing removable bollards . bid service provided for that purpose and issued to the specific bidder by the Director of Public Works together a bid bond equal to at least five (5 ) but not more than ten ( 10 ) percent of the bid payable to the City of Green Bay as a guarantee that if his / her bid is accepted , he/ she will execute and file the contract and a performance bond in the amount of one hundred percent ( 100 % ) of the total bid within ten (10 ) days after the award of the contract . The City of Green Bay , Wisconsin reserves the right to reject any or all bids and to waive any informality in bidding . No bids shall be withdrawn after the opening of bids without the consent of the City of Green Bay , Wisconsin for a period of sixty (60 ) days after the scheduled time for closing bids .

GC Bidding

Playgrounds / Parks / Athletic Fields

$350,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
57
Bidding Soon
868
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2026

July 23, 2026

Project location map

Multiple Locations, Green Bay, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.