BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 8, 2026 at 8:00 PM

Updated June 9, 2026

Renovation of an educational facility in Kenmore, Washington. Completed plans call for the renovation of a educational facility.

The Northshore School District will be accepting statements of qualifications from capable General Contractor / Construction Manager (" GC / CM " ) firms or teams for the development and construction of the Northshore School District's Inglemoor High School Replacement Phase 2 project located in Kenmore , Washington . The School District intends to award this Contract utilizing a competitive negotiation process authorized by RCW 39.10 . Registration must include the company name , address , email , phone , and fax numbers . Question Deadline 06/22/2026 at 3:00 PM PT All questions regarding this Request for Qualifications shall be submitted via Bonfire, NSD will respond via addendum. If there are issues with Bonfire, email Erin Person at eperson@nsd.org. PROJECT DESCRIPTION The project is to construct the second phase of a phased replacement for Ingelmoor High School. Hutteball+Oremus Architecture is the architect for the project. The second phase will potentially include the following scope: • Complete the construction of the second of the three-phase replacement of Inglemoor High School, to include staggered phasing within the second phase • Improve functional performance throughout the school • Increase athletics support space • Possible replacement of the surface and infrastructure for the existing athletic fields and facilities • Increase quality and quantity of restrooms • Improve learning spaces • Geothermal heating/cooling systems • Possible removal of existing portables • Placement of additional temporary portables • Demolition of existing 800 and 900 classroom buildings – Phase 2A • New gymnasium, auxiliary gym, locker rooms and health spaces – Phase 2A • New theater and associated spaces – Phase 2A • Demolition of 500 (existing gymnasium building) – Phase 2B • New 3-story classroom wing – Phase 2B • Right of Way improvements as dictated by the jurisdiction NSD is using the GC/CM delivery method to maximize the value of available funding, carefully plan, and execute work on this project. NSD desires to retain the GC/CM as a project partner in the design development stage to define the most efficient and effective method and approach to phasing and staging, integrated safety practices, high performance building goals, and the overall delivery schedule. Collaborative GC/CM procurement will optimize the combined work of the OwnerArchitect-Contractor team to promote innovative design and the best construction value to NSD.

GC Bidding

Educational

$300,000.00

Public - State/Provincial

Renovation

3

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
286
Active Projects
130
Bidding Soon
2,080
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2026

July 1, 2027

Project location map

15500 Simonds Rd NE, Kenmore, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.