Published June 8, 2026 at 8:00 PM

Updated June 12, 2026

Site work and paving for a road / highway in Cicero, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Sealed bids will be accepted for the asphalt reconstruction and shouldering of Cicero Road and Kasperek Road. Road to be pulverized , graded , shouldered and re - paved is Cicero Road from State Hwy 47 East to Old Hwy 47 , as marked . The Cicero Road project would be 5175 feet long and 20 feet wide with a 1-foot shoulder on each side . PULVERIZING AND GRADING - The Town of Cicero will be accepting proposals for asphalt pulverizing and grading . Road surface will be pulverized at a depth of twice the thickness of the existing asphalt . Pulverizing will be at a width of 1 foot wider than the existing asphalt on each side to include shoulders , for a total width of 22 feet . Existing asphalt is to be sawed on both ends of road as marked . Any asphalt driveways will be saw cut as marked . Pulverized material shall be rolled with a sheep's foot roller for the purpose of compacting material and breaking up larger pieces of asphalt which may exist after grinding . Pulverized material shall be graded to proper cross slope for new asphalt pavement . After grading is complete , road base shall be compacted with a finish roller . Approximate date for work to begin shall be determined with input from the town . PAVING - The Town of Cicero will be accepting proposals for asphalt paving on pulverized , compacted millings . Pulverized road must be fine graded prior to paving . Base mat of asphalt will be paved 20 feet wide at a thickness of 1 1/2 inches after compaction . Base mat of asphalt shall be allowed to set for a period of time not less than 24 hours before applying finish mat . Finish mat could be applied the same day as the base mat with Town approval . Road shall be swept if needed , and dry , with tack applied before finish mat of asphalt is paved . Tack must be allowed to break before finish mat is applied . Finish mat shall be paved 20 feet wide at a thickness of 1 1/2 inches after compaction . Base mat and finish mat shall be rolled to proper compaction , for maximum pavement life . Placement of asphalt will be done with a full width screed on paver or two pavers will be used side by side as to not have a center seam or cold center seam on road . If two pavers are used , they must not be more than 100 feet apart during paving . Asphalt pavement shall be extended 18 inches beyond road width by all driveways . Paving will be done with end shoes on screed in the down position for even compaction across mat .

Post-Bid

Roads / Highways

$3,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
36
Bidding Soon
958
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

August 10, 2026

Project location map

Multiple Locations, Cicero, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.