Happy Independence Day

Life, liberty, and the pursuit of better bids.

Buy Now →
BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Demolition and site work for a hospitality development in Anchorage, Alaska. Completed plans call for the demolition of a 14,300-square-foot hospitality development; and for site work for a hospitality development.

Demolition- Big Timber Motel 446 Unga Street, Anchorage, Alaska This is a commercial building demolition involving complete removal of Big Timber Motel structures at 446 Unga Street, Anchorage. Work includes utility disconnection, foundation removal, and backfilling. May require Alaska contractor licenses, mandatory site visit attendance, and completion within 14 calendar days. Question Deadline 06/08/2026 at 12:00 PM AKT Questions and requests for interpretation or clarification of the bidding Documents shall be made in writing to the Purchasing Office (wwpur@muni.org). Please reference the Invitation to Bid Number & Project Title. Do not contact the specified department directly. ESTIMATED CONSTRUCTION COST: Between: $100,000 - $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work presented in the Bid Proposal for this contract consists of a complete demolition and removal of all structures and removal of any temporary structures or shipping containers. No structures to remain. Utilities serving this property shall be disconnected and removed as detailed below. Existing paved surfaces shall remain in place. Note 1: Sewer lines to be terminated at property line. Note 2: Water line to be terminated at the key box. Note 3: All other utilities to be coordinated with providers. Note 4: Total Square Footage: Approximately 14,300 Note 5: After removal of foundation, the excavation shall be backfilled to be level with existing grade. Note 6: No known hazardous material, however, the presence of asbestos is possible. Note 7: Demo must be completed within 14 calendar days of contract award Note 8: This building consists of multiple, attached structures. All structures are to be demolished and removed to disposal site in accordance with Article 4.5 Disposal Sites.

Sub-Bidding

Hotel / Motel

$500,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
8
Bidding Soon
190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2026

July 16, 2026

Project location map

446 Unga St, Anchorage, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.