BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Site work for a water / sewer project in Hopkinton, Massachusetts. Completed plans call for site work for a water / sewer project.

The Town of Hopkinton is seeking proposals for sewer FOG remediation and odor (H2S) reduction at the Carriage Hill, Sandy Beach, West Main St, and Wood St sewer station locations in Hopkinton. Questions can be posted on beacon bid platform no later than , Jun 12 , 2026 , 5:00 PM . CARRIAGE HILL , SANDY BEACH & WEST MAIN LIFT STATIONS 12 -Month Program Agreement to reduce heavy build -up of fats , oils and greases and eliminate excessive back -ups , pump outs and emergency calls , include the following : o All the products and equipment should ship to Department of Public o o Work ( DPW ) and vendor will be responsible for the installation , programing and system adjustments Regular monthly service calls including replacement and maintenance with follow up service reports . Lifetime warranty on equipment and parts . If there is a problem with any of the Products or equipment they should be replaced at no cost . Products and Equipment must include following or equivalent : PrimeZyme TM-Liquid Bacterial /Enzyme Treatment (055 , QTY2 ), (05/019 , QTY4 ) Pit Raider (TM) -Hydrogen Sulfide and Sludge Treatment (055 , QTY1 ) (015 , QTY2 ) Sta -Zyme Plus -Powdered Bacterial Maintainer ( LB25 , QTY1 ) Line Bac'RTM -Bacterial Drain Maintainer (05/019 , QTY3 ) 24/7 Drain Dosing Station -Programmable Feed Pumps (QTY4 )WOOD ST PUMP STATION : 12 -Month Program Agreement to protect town's system against corrosion by lowering levels of high risk H2S gas to include the following : All the products and equipment must ship to the Department of Public Work (DPW ) and vendor will be responsible for the installation , programming and system adjustments . o Regular monthly service calls including replacement and maintenance with follow upervice reports . Lifetime warranty on equipment and parts . If there is a problem with any of the products or equipment they should be replaced at no cost . Products & Equipment include must include following or equivalent : o Nutri Pro (TM) - Hydrogen Sulfide Treatment (055 - QTY10 ) o o Pit Raider (TM) - Hydrogen Sulfide and Sludge Treatment (055 - QTY5 ) Kronos 20 - Programmable Feed Pumps (QTY2 ) o Odalog(R) Hydrogen Sulfide Gas Logger (QTY1 ) The vendor must assign an account manager for the town who will be responsible for coordinating the setup and installation of the account and the programs associated with it, and be Town's go -to contact for assistance and questions along the way

GC Bidding

Water / Sewer

$1,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
863
Active Projects
365
Bidding Soon
5,378
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2026

July 1, 2026

Project location map

Multiple Locations, Hopkinton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.