Published August 11, 2026 at 8:00 PM
Updated August 17, 2026
Site work for a playground / park / athletic field in Hopewell Junction, New York. Completed plans call for site work for a playground / park / athletic field.
Reference Number 0000426527 The Town of East Fishkill is soliciting bids for the the restoration of Pickleball Courts located at Lime Kiln Receration Park. Restoration of Pickleboard Court located at Lime Kiln Recreation Park. Restoration includes milling, repairing, new posts, resurfacing, and stripping the Pickleboard courts. WORK SHALL COMMENCE ON OR ABOUT AUGUST 15, 2026. SUBSTANTIAL WORK SHALL BE COMPLETED BY SEPTEMBER 30, 2026. Question Acceptance Deadline : 06/24/2026 02:00 PM EDT Questions are submitted online No All questions are to be emailed to Town Clerk , cassidyp@eastfishkillny.gov CONTRACTOR SCOPE: 1. Access property via Lime Kiln Road entrance and pathways. Contractor to restore any damage or impacts to pathway that occur during project. 2. Mill tennis court surface to a depth of up to 3.0 inches +/-. Milling to set slope of court to have a 1% cross pitch. Mill area to be entire surface, which is approximately 120 ft x 110 ft. Engineer to confirm subbase after milling and prior to any other work. Millings to be removed and disposed of at Highway Garage or other location within Town Corporate limits. Town to provide trucking. Assume 1 truck being available. 3. Prepare and replace 6-inch subbase. Contractor to remove, provide and install 6-inch subbase. Subbase to be item 4 material and compacted to 95%. Contractor responsible to bring, install, and compact subbase. 4. Install Center Court Fence Posts. Posts to be 2-38 in . diameter, black vinyl coated, 8 ft above grade. Posts to be set in 24-inch diameter, 4 ft deep concrete footings. Footings to use 4,000 psi concrete and to be 3-inch below finish grade. Town to provide posts. Contractor to install up to 10 posts. 5. Install Pickle Court posts/sleeves. Posts to be set in 24-inch diameter, 4 ft deep concrete footings. Footings to use 4,000 psi concrete and to be 3-inch below finish grade. Town to provide posts/sleeves. Contractor to install up to 12 posts. 6. Contractor to pave surface with hot mix asphalt pavement. Pavement to have no aggregate larger than 3/8 inch, as described as TYPE 6F NYSDOT Item No.: 403.1701. Pavement to be rolled with a 20-ton roller and be installed in one lift. TOWN SCOPE: 1. Town to remove perimeter fencing and posts on one side of project area. 2. Town to remove existing interior posts and properly backfill and compact excavated posts. 3. Town to provide and install court non-slip acrylic paints and lining. 4. Town to install black vinyl center fence. 5. Town to re-install perimeter posts and fencing.
Award
Playgrounds / Parks / Athletic Fields
$56,500.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2026
August 15, 2026
5 Old Lime Kiln Rd, Hopewell Junction, NY
Related To This Project
Hopewell Junction, NY
--
Hopewell Junction, NY
--
Hopewell Junction, NY
Bid Date: Apr 30 2026
Hopewell Junction, NY
Bid Date: Apr 17 2026
Hopewell Junction, NY
--
Hopewell Junction, NY
Bid Date: May 19 2026
Hopewell Junction, NY
--
Hopewell Junction, NY
Bid Date: Mar 24 2026
Hopewell Junction, NY
Bid Date: Feb 17 2026
Hopewell Junction, NY
Bid Date: Mar 10 2026
Hopewell Junction, NY
Bid Date: Feb 19 2026
Hopewell Junction, NY
Bid Date: Feb 18 2026
Hopewell Junction, NY
Bid Date: Feb 25 2026
Hopewell Junction, NY
Bid Date: Nov 06 2025
Hopewell Junction, NY
Bid Date: Oct 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.