Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 13, 2026 at 8:00 PM
Updated August 19, 2026
Site work for a mixed-use development in Clinton, Illinois. Completed plans call for site work for a bridge / tunnel; and playground / park / athletic field.
**As of August 12th, 2026, the project was awarded to CSD Environmental Services, Inc with an awarded amount of $197,522.48** IDNR is seeking a vendor to make improvements to the trail system at Weldon Springs State Park in Dewitt County. See Contract and Attachments for further details. The proposed Weldon Springs Recreational Trail and Bridge Improvements Project is located on the south half of Weldon Springs State Park, along the hiking trails between the dam and the Long Point Group Campsite in DeWitt County of central Illinois. DESCRIPTION OF THE PROJECT The Weldon Springs Recreational Trail and Bridge Improvements Project consists of furnishing all labor, materials, tools and equipment for the removal of an existing timber bridge structure, installing a new timber bridge structure, installing new timber stairs, shallow concrete caisson foundations and associated reinforcement steel, traffic control for hiking paths, parking lots, and roadways as necessary to complete the project, erosion control as outlined in the plans, and maintenance and clean-up of affected trails, parking areas, and park roads used for the project.
Award
Playgrounds / Parks / Athletic Fields
$197,522.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2026
July 7, 2026
Multiple Locations, Clinton, IL
Related To This Project
Clinton, IL
Bid Date: Jun 23 2026
Clinton, IL
--
Clinton, IL
Bid Date: Jul 28 2026
Clinton, IL
Bid Date: Aug 28 2026
Clinton, IL
Bid Date: Aug 28 2026
Clinton, IL
Bid Date: May 12 2026
Clinton, IL
Bid Date: Apr 01 2026
Clinton, IL
Bid Date: Mar 26 2026
Clinton, IL
Bid Date: Feb 04 2026
Clinton, IL
Bid Date: Feb 05 2026
Clinton, IL
Bid Date: Jan 13 2026
Clinton, IL
--
Clinton, IL
--
Clinton, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
