BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 8, 2026 at 8:00 PM

Updated July 20, 2026

Site work for a playground / park / athletic field in Waukesha, Wisconsin. Completed plans call for site work for a 4,700-square-foot playground / park / athletic field.

Remove 750 square feet of existing sidewalk and concrete ribbon. Install 750 square feet of 4-inch concrete sidewalk and concrete ribbon. Install approximately 4,700 square feet of resilient surface. Perform lump sum park shaping and grading. Place 400 square yards of topsoil and sod. Only electronic bids will be accepted through www.questcdn.com. Contract documents may be viewed and downloaded by registering with HUBEXO QuestCDN online. To be considered a plan holder for bids, a Contractor must register on QuestCDN.com and purchase the Contract Documents in digital form for downloading at a non-refundable cost of $42. Registering as a plan holder is recommended for all prime contractors and subcontractors as plan holders will receive addendums and other contract document updates via HUBEXO QuestCDN. Pre-qualification: Required. No. 1 - The work contained in this Contract is to be done in accordance with the City of Waukesha Standard Construction Specifications – 2026 Edition, the Specifications for Water Main & Service Lateral Materials and Installation of Water Main & Appurtenances for Waukesha Water Utility of the City of Waukesha dated November 21, 2019, the regulations of the Wisconsin Department of Natural Resources (WDNR), AWWA Specifications, Manufacturers’ Recommendations and the Standard Specifications for Sewer and Water Construction in Wisconsin, latest Edition, except as provided for within this document. All applicable sections of the revised City of Waukesha Standard Construction Specifications are available to bidders on the City of Waukeshas website: No. 2 - The work included in this contract involves: Removal and installation of concrete sidewalk and ribbon Installation of resilient surface Grading, Topsoil, and Sod There are mandatory alternate bid items included in the contract schedule of prices. The City shall reserve the right to include any of the alternate items within the contract that is most advantageous to the City. Contractor shall provide unit bid pricing for all mandatory alternate items.

Bid Results

Playgrounds / Parks / Athletic Fields

$112,800.00

Public - City

Site Work

3

4

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
458
Active Projects
6
Bidding Soon
3,325
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2026

August 10, 2026

Project location map

Atlantic Dr, Waukesha, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.