BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 11, 2026

Site work and renovation of a water / sewer project in Pewaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

The project involves the exterior repainting with containment, wet interior repainting, and miscellaneous repairs of the Village of Pewaukee, Wisconsin 125,000 gallon reservoir (Well 3) located at 1004 Hickory Street. The scope of work includes abrasive blast cleaning to SSPC-SP6 commercial standard for the exterior and SSPC-SP10 near-white metal standard for the wet interior, with application of specified multi-coat zinc epoxy urethane systems. Repairs and modifications include: installation of sidewall manway and gasket, wet interior roof hatch gasket, sample tap and chemical feed tap on the draw pipe, overflow discharge modification, replacement of fall prevention devices, trimming and guarding of exterior ladders, sidewall platform installation, roof vent replacement with a pressure vacuum vent, roof handrail and railing, pit welding, wet interior sump installation, and realignment of the overflow splash pad. Coordination and payment for removal and reinstallation of the cathodic protection system is also required. Additional work includes grout repair and epoxy coating of the foundation. Bidders are instructed to examine the Bid Requirements and Contract Documents, available at specified locations and via QuestCDN.com. Bidders must follow the procedures and submission requirements as set forth in the Instructions to Bidders and Supplemental Instructions to Bidders as applicable. Only registered plan holders will be notified of late addenda. The contractor is to commence work on or after July 1, achieve substantial completion by October 31, and must limit the tank out-of-service period to 45 days. Work hours are from 7:00 AM to dusk. Liquidated damages apply for late completion and exceedance of allowed out-of-service time. Pre-qualification requirements: Dixon Engineering will review qualifications of all contractors and determine their status. Contractors will be prequalified for different sized tanks and towers based on experience, workmanship, successful project completions with Dixon, and contractor's financial data. Any contractor with projects in dispute or unfinished due to contract problems will be considered not prequalified. The prequalification protocol is detailed in the Instructions to Bidders.

GC Bidding

Water / Sewer

$500,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

21

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
352
Active Projects
210
Bidding Soon
3,229
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2026

July 1, 2026

Project location map

1004 Hickory St, Pewaukee, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.