BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 11, 2026

Demolition, site work, new construction and renovation of an educational facility in Stuart, Florida. Completed plans call for the construction of a educational facility; and 44,869-square-foot, two-story above grade educational facility.

Phase II will include the remaining balance of construction required to complete the Murray Middle School modernization project following the Phase I Early Works and Early Procurement package. The scope includes demolition of Building #05 & #09, select gymnasium demolition, a 44,869 GSF 2 story building, including concrete, masonry, brick veneer, rough carpentry, millwork, fireproofing/stopping, roofing, caulking & waterproofing, doors/frames/hardware, glazing, stucco, interior framing and drywall, ACT, flooring, painting, specialties, equipment, window treatments, canopies, fire sprinkler, plumbing, HVAC systems (including installation of Dual path AHUs, DX 100% OH AHUs, Water-cooled chiller, Chilled water and condensate pumps, VAVs and VFDs), electrical systems (including installation of Switchgear & 1 MTS transfer switch), fire alarm, DAS, BDA, communications, AV, access control, video surveillance, lightning protection, and final campus improvements such as final sitework, landscaping & irrigation, permanent fencing, testing, closeout, and commissioning. In addition, the existing Gymnasium Building #6 will be modernized and scope includes demolition of the existing flooring, bleachers and HVAC systems. Building #6 also includes new lighting, athletic flooring, bleachers, paint and repairs to the existing metal roof. This scope excludes early procured ODP equipment and early works already addressed under Phase I, as well as demolition of Buildings 10 and 18, temporary access road, structural steel package, elevator package, existing chiller removals, secondary electrical duct bank, buried communication vault removals, temporary fencing/barricades, vibro replacement scope, and related early testing/surveying/site-enabling activities. Sealed proposals are solicited from qualified subcontractors for the above bid packages. Subcontractors are responsible for reviewing all issued documents, addenda, schedules, and delivery requirements prior to submitting a proposal. All equipment, materials, submittals, delivery, coordination, and closeout requirements shall comply with the project documents, Martin County School District standards, and applicable codes and Authority Having Jurisdiction. Owner and/or Construction Manager reserve the right to reject any or all proposals, to accept any proposal which is in its best interest, and to waive any informalities and technicalities in procedure. All costs incurred by subcontractors to prepare and submit a proposal shall be the sole responsibility of the proposer. Pre-qualification requirements: Subcontractors must be prequalified prior to award, though prequalification is not mandatory to submit a bid. Bidders who are not prequalified at the time of award may be deemed non-responsive or otherwise ineligible for award consideration. Interested bidders are strongly encouraged to begin the prequalification process as soon as possible. The contents of the prequalification questionnaire and all associated documents will be considered confidential and used solely to determine the firm's qualifications.

Sub-Bidding

Educational

$20,000,000.00

Public - County

Demolition, New Construction, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
104
Bidding Soon
1,583
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2026

August 24, 2026

Project location map

4400 SE Murray Street, Stuart, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.