BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 11, 2026

Site work and paving for a road / highway in Honey Brook, Pennsylvania. Completed plans call for site work for a road / highway.

Bid proposals are invited for the Cupola Road Overlay project, which includes placement of a ½” 9.5mm Scratch Course (551 tons) and a 12.5 mm wearing course overlay (1,651 tons) along with other work as specified in the bid documents. Bids must be submitted via PennBID using forms provided on the platform. A mandatory pre-bid project review must be attended on one of the designated dates. Work completion is required by the specified deadline, with liquidated damages applicable for delays. Pennsylvania Prevailing Wage Rates are required. Submission requirements include a certified check or bid bond equal to ten percent of the bid, PennDOT prequalification, workman’s compensation affidavit, anti-collusion affidavit, CDL compliance certificate, public works employee verification, and proof of insurance. The successful bidder must provide a performance bond, payment bond, and insurance certificate within 20 days of contract award. The agency reserves the right to reject any or all bids or waive defects or irregularities.

Sub-Bidding

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
806
Active Projects
422
Bidding Soon
5,018
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2026

August 16, 2026

Project location map

Cupola Road, Honey Brook, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.