BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 15, 2026 at 8:00 PM

Updated July 21, 2026

Site work for a sidewalk / parking lot in West Jordan, Utah. Completed plans call for site work for a sidewalk / parking lot.

The work comprises the concrete paving of the park strip on the southeast side of Copper Hills Parkway from Grizzly Lane to Mascaro Way. The work includes grubbing and removal of excess soil, preparation and compaction of the subgrade, placement and proper compaction of road base, and placing colored, stamped concrete. Questions Due Date: Jun 23rd 2026, 10:00 AM MDT Questions with responses that could have a significant impact on the responses to the BID, but arise subsequent to the issuance of this BID, should be submitted in the BID Question and Answer section Event Number #WJPS26060901 at the Utah Public Procurement Place Bonding range is estimated to be between $190,000 - $220,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A. The Work of this Contract generally includes but is not limited to construction of a new concrete park strip and removal and replacement of damaged concrete sidewalk panels. B. The Work is located in West Jordan, Utah, at locations identified on the construction plan map.

Bid Results

Sidewalks / Parking Lot

$220,000.00

Public - City

Site Work

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
69
Bidding Soon
1,223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2026

August 14, 2026

Project location map

Copper Hls Pkwy, West Jordan, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.