Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 29, 2026 at 8:00 PM
Updated July 8, 2026
Demolition, site work, paving, new construction and renovation of a bridge / tunnel in Wood River, Wisconsin. Completed plans call for the demolition of a bridge / tunnel; for the renovation of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Removal of existing structure over waterway, replacement of bridge deck, and updating of road approaches. Scope includes excavation, backfill, asphaltic surface, timber bridge deck installation, erosion control, and site restoration. Bonds: 5% Bid Bond. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Troy Peterson, 715-235-9081 or troy.peterson@cedarcorp.com 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than five days prior to the date for opening of Bids may not be answered.
Bid Results
Bridges / Tunnels
$186,981.00
Public - City
Demolition, New Construction, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2026
August 9, 2026
N Fork Dr, Wood River, WI
Related To This Project
Wood River, WI
Bid Date: Nov 09 2021
Hayward, WI
Bid Date: Jun 30 2026
Blaine, WI
Bid Date: Jul 04 2026
Stanley, WI
Bid Date: Jun 25 2026
Plover, WI
Bid Date: Jun 25 2026
Madison, WI
Bid Date: Jul 09 2026
Madison, WI
Bid Date: Jul 07 2026
Wauwatosa, WI
Bid Date: Jul 31 2026
Stoughton, WI
Bid Date: Jul 02 2026
Appleton, WI
Bid Date: Jun 23 2026
Pittsfield, WI
Bid Date: Jun 23 2026
Saukville, WI
Bid Date: Jun 25 2026
Hudson, WI
Bid Date: Jun 25 2026
Camp Douglas, WI
Bid Date: Jul 13 2026
Prescott, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
