Published July 24, 2026 at 8:00 PM
Updated July 27, 2026
Site work and paving for a road / highway in Minot AFB, North Dakota. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Provide all labor, materials, equipment, and supervision necessary to repair and replace sections of the Mass Parking Apron (MPA) at Minot Air Force Base using a design-bid-build approach. Work involves phased removal and replacement of existing pavement sections over multiple years to establish a uniform apron width of 340 feet south of the MPA centerline taxiway. The project includes construction of new Portland cement concrete (PCC) pavement, installation of temporary asphalt concrete (AC) transitions to tie new and existing pavement, and limited grading of adjacent turf areas to improve drainage. Existing asphalt shoulders will be milled, removed, and stockpiled for future use, with all work performed in accordance with project specifications and applicable standards. Repair/Replace Mass Parking Apron , Section V at Minot AFB, ND: This project will be executed using a design-bid -build (DBB) project delivery method, which will require the contractor to provide the government with a complete warranty based on the Request for Proposal (RFP). The estimated construction cost of this project is between $25,000,000 and $35,000000. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5' narrower than the western half south of the MPA centerline taxiway (335' vs. 340'). This project will establish a uniform MPA width of 340' south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2" drop-off at edge per UFC 3-260-01 , Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Reference 01 14 00 WORK RESTRICTIONS for additional information and requirements. The Government reserves the right to award a contract without discussions in accordance with (IAW) RFO 52.215-1 . Therefore, the offeror's initial proposal should contain the offeror's best terms from a technical and cost/price standpoint. Offerors shall organize their proposals as described herein. Proposals may be determined non-compliant for failure to follow this format and may be rejected from further consideration. Competition for this contract will be set-aside for small business. The North American Industry Classification System (NAICS) code is 237310 (Highway, Street, and Bridge Construction), with a corresponding small business size standard of $39.5M The estimated construction cost of this project is between $25,000,000 and $35,000000. Questions and/or comments relative to these documents should be submitted via Bidder Inquiry as indicated below. Question and/or comments relative to these bidding (proposal) documents that is proprietary in nature or if Bidder Inquiry system (See Below) is out of service should be submitted to the Contract Specialist: Contract Specialist - Primary POC: Shayna Zeleznik shayna.j.zeleznik@usace.army.mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Roads / Highways
$35,000,000.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2026
October 19, 2026
220 Golf Dr, Minot AFB, ND
Related To This Project
Minot AFB, ND
--
Minot AFB, ND
Bid Date: Jul 28 2026
Minot AFB, ND
Bid Date: Jul 29 2026
Minot AFB, ND
Bid Date: Jun 01 2026
Minot AFB, ND
Bid Date: Apr 28 2026
Minot AFB, ND
Bid Date: Apr 22 2026
Minot AFB, ND
--
Minot AFB, ND
Bid Date: Feb 17 2026
Minot AFB, ND
Bid Date: Feb 10 2026
Minot AFB, ND
Bid Date: Feb 27 2026
Minot AFB, ND
--
Minot AFB, ND
Bid Date: Jan 10 2026
Minot AFB, ND
Bid Date: Oct 21 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.