Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 11, 2026 at 8:00 PM
Updated June 12, 2026
This is a service / maintenance or supply contract in Liberty, Pennsylvania. Contact the soliciting agency for additional information.
Initiating Organization: Engineering District 2 5-0 Agreement Type: Project Specific 100% State Funded: No Services Requested: Design and Misc Services Selection Process: Modified Part 1 Location Description State Route/Section Mckean County 0150/A08 Part Name: McKean Co. SR 155-A08 - Preliminary Design Project Description: This part consists of the Preliminary Design for the replacement of the bridge carrying SR 155 (BMS# 42-0155-0020-0549) over Branch Portage Creek in Liberty Township, McKean County. The roadway is classified as a Rural Minor Collector with a current ADT less than 900. The existing structure is a steel pipe-arch culvert built in 1956 and has a 10 foot structure length and a 64.2 foot structure width. The speed limit is 55 mph. Half-width construction with temporary signals (3 units) is anticipated for Traffic Control but will need to be evaluated during preliminary design. Required services will include but not be limited to: Project Management (Administration/Scheduling/Meetings), Surveys, Line/Grade/Typical Sections, Cross Sections, Utility Coordination, H&H analysis, Final T.S. & L Plans, SEPS and Structure Borings, Waterway Permit, Preliminary Right-of-Way Plans, Preliminary M.P. & T Plans, Design Field View Package, Erosion and Sedimentation Plan/Narrative. Department will complete the environmental documents with supplemental information provided by the consultant. Anticipated NTP: 11/1/2026 Project Time: Day Time Part 2 Location Description State Route/Section Mckean County 0150/A08 Part Name: McKean Co. SR 155-A08 - Final Design Project Description: This part consists of the Final Design for the replacement of the structure carrying SR 155 (BMS# 42-0155-0020-0549) over Branch Portage Creek as described under Part 1. Required services will include but not be limited to: Project Management (Administration/Scheduling/Meetings), Supplemental Surveys, Roadway Design/Plans/Constructability Review Coordination, Cross Sections, Utility Engineering, Final Right-of-Way Plan, Final Structure Foundation Report, Final Structure Plans, Traffic Control Plan, Utility Relocation Plan, and P.S. & E package preparation. Anticipated NTP: 2/1/2027 Project Time: Day Time Part 3 Location Description State Route/Section Mckean County 0150/A08 Part Name: McKean Co. SR 155-A08 - Construction Consultation Project Description: This part consists of the Construction Consultation and Shop Drawing Review for the replacement of the structure carrying SR 155 (BMS# 42-0155-0020-0549) over Branch Portage Creek as described under Part 1. Required services will include but not limited to: Post Design Activities, Shop Drawing Review and Construction Consultation. Anticipated NTP: 4/1/2027 Project Time: Day Time Part 4 Location Description State Route/Section Potter County 4002/A01 Part Name: Potter Co. SR 4002-A01 - Preliminary Design Project Description: This part consists of the Preliminary Design for the preservation of the bridge carrying SR 4002 (BMS# 52-4002-0012-0000) over Allegheny River, Coudersport Borough, Potter County. The roadway is classified as a Rural Local with a current ADT less than 700. The existing structure is a steel grider/floorbeam bridge built in 1959 and has a 75 foot structure length. The speed limit is 35 mph. Half-width construction with temporary signals is anticipated for Traffic Control but will need to be evaluated during preliminary design. Required services will include but not be limited to: Project Management (Administration/Scheduling/Meetings), Surveys, Line/Grade/Typical Sections, Cross Sections, Utility Coordination, H&H analysis, Final T.S. & L Plans, SEPS and Structure Borings, Waterway Permit, Preliminary Right-of-Way Plans, Preliminary M.P. & T Plans, Design Field View Package, Erosion and Sedimentation Plan/Narrative. Department will complete the environmental documents with supplemental information provided by the consultant. Anticipated NTP: 11/1/2026 Project Time: Day Time Part 5 Location Description State Route/Section Potter County 4002/A01 Part Name: Potter Co. SR 4002-A01 - Final Design Project Description: This part consists of the Final Design for the preservation of the structure carrying SR 4002 (BMS# 52-4002-0012-0000) over Allegheny River as described under Part 1. Required services will include but not be limited to: Project Management (Administration/Scheduling/Meetings), Supplemental Surveys, Roadway Design/Plans/Constructability Review Coordination, Cross Sections, Utility Engineering, Final Right-of-Way Plan, Final Structure Foundation Report, Final Structure Plans, Traffic Control Plan, Utility Relocation Plan, and P.S. & E package preparation. Anticipated NTP: 2/1/2027 Project Time: Day Time Part 6 Location Description State Route/Section Potter County 4002/A01 Part Name: Potter Co. SR 4002-A01 - Construction Consultation Project Description: This part consists of the Construction Consultation and Shop Drawing Review for the preservation of the structure carrying SR 4002 (BMS# 52-4002-0012-0000) over Allegheny River as described under Part 1. Required services will include but not limited to: Post Design Activities, Shop Drawing Review and Construction Consultation. Anticipated NTP: 4/1/2027 Project Time: Day Time The method of contractor selection has not been determined at this time. PA DOT - RFQ - North Central RPO Bridge Rehab/Replacement Projects - SR 4002-A01 & SR 155-A08
Conceptual
Bridges / Tunnels
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 1, 2026
Multiple Locations, Liberty, PA
Related To This Project
Liberty, PA
Bid Date: May 15 2026
Liberty, PA
Bid Date: May 15 2026
Liberty, PA
Bid Date: May 12 2026
Liberty, PA
Bid Date: May 28 2019
Liberty, PA
--
Liberty, PA
Bid Date: Jun 18 2025
Liberty, PA
Bid Date: Apr 21 2025
Liberty, PA
Bid Date: Feb 04 2025
Liberty, PA
--
Liberty, PA
--
Liberty, PA
--
Liberty, PA
Bid Date: Jan 16 2025
Liberty, PA
Bid Date: Nov 04 2024
Liberty, PA
Bid Date: Jul 29 2024
Liberty, PA
Bid Date: Jun 10 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
