BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 12, 2026 at 8:00 PM

Updated June 13, 2026

Site work for a water / sewer project in Apple Valley, Minnesota. Completed plans call for site work for a water / sewer project.

Furnishing of all labor, materials, and all else necessary for City Project 2026-152, 2026-2027 CIPP Sanitary Sewer Improvements, including installation of 516 LF of 8” VCP with associated bypass pumping, 2222 LF of 15” RCP with associated bypass pumping, 1934 LF of 18” RCP with associated bypass pumping, 625 LF of 21” RCP with associated bypass pumping, 640 LF of 27” RCP with associated bypass pumping, 451 LF of 30” RCP with associated bypass pumping, 14 each 4” sewer laterals 3’, 2 each 6” sewer laterals 3’, traffic control, mobilization, and related items. Bids are to be submitted electronically through QuestCDN ONLY. Bid security in the amount of 5 percent of the bid must be submitted through Surety 2000. The successful bidder must be a responsible contractor as defined by Minnesota Statutes. The Owner reserves the right to reject any and all bids, to waive irregularities and informalities, and to award the contract in the best interests of the Owner.

GC Bidding

Water / Sewer

$900,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
115
Bidding Soon
2,076
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2026

August 21, 2026

Project location map

To Be Determined, Apple Valley, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.