BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 30, 2026 at 8:00 PM

Updated July 8, 2026

Renovation of an educational facility in Eugene, Oregon. Completed plans call for the renovation of a educational facility.

Project includes installation of a new chilled water pump station, piping, air-cooled chiller, cooling coils, control valves, VRF systems, thermowells, pressure sensor connections, and required electrical upgrades. Work also includes associated piping and wiring, coordination with the controls contractor, startup, testing, adjusting and balancing, and training for District Facilities Operations & Maintenance staff. Question Deadline 06/30/2026 Requests for clarification or interpretation of the Bidding Documents shall be submitted by the Bidder in writing and shall be received by the Architect at least seven days prior to the date for receipt of Bids. For questions regarding this project, please contact the Project Manager: Name: Kirk Gebb Email: Gebb@4j.lane.edu Briefly, the work is described as: 1. Installation of new chilled water pump station & chilled water piping; 2. Installation of new air-cooled packaged chiller; 3. Installation of new cooling coils and condensate pans and drains in existing air handling units; 4. Installation of new cooling coil pressure independent flow control valves; 5. Installation of new cooling / heating system changeover valves; 6. Installation of new VRF systems in three existing classroom pods; 7. Installation of new pipeline thermowells and pressure sensor connections for control devices provided by separate controls contractor; 8. Installation of new electrical service to chiller, and modifications of existing electrical systems to serve chilled water pump station and VRF systems; 9. Installation of new piping and electrical conduit and wiring to new equipment as required, and all related accessories; 10. Coordination of all work with separately contracted Controls Contractor; 11. Startup, testing, adjusting & balancing; 12. Training of District Facilities O&M Staff

GC Bidding

$1,100,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
8
Bidding Soon
445
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.