BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 21, 2026 at 8:00 PM

Updated July 27, 2026

Demolition, site work and new construction of a civil project in Sunny Isles Beach, Florida. Completed plans call for the construction of a water / sewer project; water / sewer project; for the demolition of a water / sewer project; water / sewer project; for site work for a water / sewer project; and water / sewer project.

Question Deadline 07/16/2026 Each such request must be in the hands of the Engineer at least five (5) days before the date for the formal opening of bids, or by the close of the Request for Information (RFI) period, whichever is earlier, in order that interpretation or clarification may be issued by the Engineer in the form of written addenda, mailed or delivered to all prospective Bidders. o Demolition and removal of existing Pump Station No.315 to the extent indicated on the plans, which includes; the existing wet well and dry well, the existing pumps, emergency pump discharge box, electrical and mechanical equipment, piping, fittings, conduits and all other appurtenances; cut and fill with flowable fill the existing influent 8-inch gravity sewer pipes and the effluent 4-inch ductile iron force main that is to be abandoned. Transport of demolition material, including asphalt pavement, miscellaneous concrete, sod, unsuitable backfill material, pipes, valves, pumps, electrical and mechanical equipment to be legally disposed and/or salvaged, as ordered by the Department; furnishing, delivering and placing suitable backfill material as necessary. o Furnishing, delivering and installing approximately 183 linear feet of 8-inch PVC (C900) DR25 colored green pipe with neoprene gaskets for gravity sanitary sewer; three (3) precast reinforced concrete shallow sanitary sewer manholes; one (1) precast reinforced concrete utility conflict manhole (Type J, 72"x52"); core drilling the existing reinforced concrete box culvert (abandoned pedestrian underpass); making a core drill connection to an existing gravity sewer manhole for connection of the proposed gravity sanitary sewer and including rehabilitation of the manhole; sheeting and shoring ordered left in place by the Engineer; sewage bypass operations with tankering, if required; furnishing all labor, materials, equipment and incidentals required for cleaning and testing the gravity sanitary sewer. Bonds: Bid Bond required (unspecified amount), Certified Check required.

Post-Bid

$444,255.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
72
Bidding Soon
1,931
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2026

July 27, 2026

Project location map

Collins Avenue Between NE 193rd St And Terracina Avenue, Sunny Isles Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.