BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 25, 2026 at 8:00 PM

Updated July 8, 2026

Site work and new construction of a bridge / tunnel in West Memphis, Arkansas. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

Replacement of a failing 48-inch metal pipe with a new 48-inch reinforced concrete pipe, including placement of pipe and backfill of an open trench area. The work consists generally of removing a section of CMP stormwater drainage pipe and replacing this pipe with a reinforced concrete pipe. Included in this work for the site will be pavement demolition and replacement, curb demolition and replacement, and replacement of the existing stormwater culvert, and all other necessary and related work to complete the project as shown on the plans and described in the specifications.

GC Bidding

$1,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
16
Bidding Soon
714
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

S McAuley Dr, West Memphis, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.