BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 1, 2026 at 8:00 PM

Updated July 15, 2026

Demolition and site work for a fire / police facility in Bryn Athyn, Pennsylvania. Completed plans call for the demolition of a fire / police facility; and for site work for a fire / police facility.

The project involves the demolition and removal of existing homes as well as accessory structures at the Fettersmill Firehouse. Bids must be submitted in a sealed envelope and clearly marked as a proposal for Fettersmill Firehouse Demolition of Existing Land Improvements. Requirements include a 10% Bid Bond, 100% Performance Bond, and 100% Payment Bond. Prevailing state wage rates and the Public Works Employment Verification Act will apply. Each bidder must submit security with their bid in the amount, form, and subject to the conditions provided in the instructions to bidders. The Township reserves the right to reject any or all bids and to make an award as appears most advantageous to the Township. 1. Mobilization - The contractor shall include all costs for material, labor, and equipment required to complete the mobilization to the project site. 2. Maintenance and Protection of Traffic - The contractor shall include all costs for material, labor, and equipment required to safely enter and exit the highway 3. Soil and Erosion Control - The contractor shall include all costs for material, labor, and equipment required to ensure no silt leaves the property. 4. Demolition - The contractor shall include all costs for material, labor, and equipment required to complete the demolition of the building structures to include removal and disposal of all material. 5. Fill Basement - The contractor shall include all costs for soil material, labor, and equipment required to complete the fill of existing basement/cellars with suitable fill after breaking up and floor slabs. 6. Site Restoration and Stabilization - The contractor shall include all costs for material, labor, and equipment required to complete the installation of 6" of topsoil through all disturbed areas, fine grade, and seed. 7. Existing Sanitary Sewer Lateral - The contractor shall include all costs for material, labor, and equipment required to complete the installation of watertight plug or cap at the limit of the foundation excavation. - 8. Coordinate Utility Services Disconnection & Termination - The contractor shall include all costs for material, labor, and equipment required to complete the coordination of the termination and disconnection of all utility services prior to the demolition of the buildings in accordance with the plans and specifications. 9. Asbestos Abatement and Removal - The contractor shall assume all asbestos has been abated prior to their commencement of work

Post-Bid

$200,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,127
Active Projects
46
Bidding Soon
7,866
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

Multiple Locations, Bryn Athyn, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.