BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 9, 2026 at 8:00 PM

Updated July 14, 2026

Site work and paving for a road / highway in Greentown, Pennsylvania. Completed plans call for site work for a road / highway.

7,000 square yards of 2.5-inch depth milling, 1,590 tons of Superpave 9.5mm leveling course, and 355 tons of 2A aggregate for a paving project. Bids must be accompanied by a 10% certified check or bid bond, payable to the municipality. Performance and payment bonds in the amount of 100% are required by the successful bidder within 20 days of contract award. The successful bidder is required to comply with Pennsylvania prevailing wages. Pre-bid project review is mandatory. Proposals must be submitted on forms furnished by the municipality, and bids must be placed in a sealed envelope marked with the project name. The Supervisors reserve the right to reject any or all bids.

Sub-Bidding

$200,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
876
Active Projects
44
Bidding Soon
6,324
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

198 Brink Hill Road, Greentown, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.