BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2026 at 8:00 PM

Updated July 16, 2026

Renovation of a mixed-use development in Reno, Nevada. Completed plans call for the renovation of a educational facility; and educational facility.

Install ADA door operators and buttons at two 5+ story UNR buildings--Argenta Hall and Raggio. Scope includes replacing double doors with sliding doors, adding a card reader at Argenta, and selective demolition and refinishing of two Raggio restrooms for accessible entry. All documents must be submitted electronically. Required insurance includes Commercial General Liability, Business Automobile Liability, Workers' Compensation, and an Installation Floater. Refer to the TEMPLATE-Owner-Contractor Construction Agreement for limits and additional information. Special considerations include building heights of over 3 stories. Construction at Argenta Hall must occur from 12/17/2026 through 01/18/2027 only. Construction at William J. Raggio is to start as soon as possible. Completion of work is subject to change by the Owner. Liquidated Damages: $500 per day Question Deadline 07/20/2026 at 5:00 PM PT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

$153,398.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
3
Bidding Soon
605
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.