BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2026 at 8:00 PM

Updated September 12, 2026

Site work and renovation of a water / sewer project in Chicago Ridge, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of July 13, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. Replacement of water main infrastructure on Nashville Avenue and Barnard Drive. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Est. Value: $ 1,600,000.00 Est. Completion Date: Nov. 6, 2026 DESCRIPTION OF WORK The proposed work (the "Work") is officially known as the "Nashville Avenue and Barnard Drive Water Main Replacement Project" and further described as the construction of approximately 3,030 feet of new ductile iron water main (directionally drilled and open cut), valve vaults, fire hydrants, new water service connections, sewer improvements, Class D patching, pavement resurfacing, restoration and all additional work necessary to complete the improvements as further described in the Contract Documents for the said Work prepared by Christopher B. Burke Engineering, Ltd. ("CBBEL"). Award is subject to final approval.

Award

$1,317,903.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
511
Active Projects
247
Bidding Soon
3,584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2026

September 7, 2026

Project location map

Barnard Dr & S Nashville Ave, Chicago Ridge, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.