BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 2, 2026 at 8:00 PM

Updated July 8, 2026

Demolition, site work, paving, renovation and addition to a fire / police facility in Vestavia Hills, Alabama. Completed plans call for the renovation of a 11,736-square-foot fire / police facility; for the addition of a fire / police facility; for the demolition of a fire / police facility; for site work for a fire / police facility; and for paving for a fire / police facility.

Renovation and addition of a 11,736 sq ft fire station, including structural improvements, CMU masonry, roofing, building envelope upgrades, door/window installation, interior buildout, complete replacement of plumbing, mechanical, electrical, HVAC, fire alarm, and communications systems, and site work including paving, utilities, and landscaping. Bonds: Bid Bond required (unspecified amount), Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Question Deadline 08/20/2026 Questions regarding this project should be directed, in writing, to Hayden Dumestre at Doster Construction (hdumestre@dosterconstruction.com) by 5:00pm local time three (3) business days prior to bid opening. Documents will be provided digitally in .pdf form only, neither Owner or Engineer will be responsible for the cost or printing of copies. The project consists of the renovation and addition of the existing Fire Station #4 in Liberty Park totaling approximately 11,736 square feet of gross building area. Work includes demolition of the existing living quarters portion of the building and construction of new foundations and slab-on-grade systems to support the renovated and expanded facility. Structural improvements will include new metal stud framing, structural framing members, CMU masonry construction, and wood truss roof framing with a new asphalt shingle roofing system. The exterior building envelope will include brick veneer systems, cast stone masonry, new thermal / weather resistant systems, metal wall panels, sheet metal flashing and trim, and installation of all new doors, windows, glazing, and storefront systems. Interior construction will include complete buildout of new and renovated spaces with updated finishes, specialties, and associated architectural components necessary to support fire station operations and living quarters. The project also includes complete replacement and grade of plumbing, mechanical, and electrical systems, including new HVAC equipment and distribution systems, plumbing infrastructure and fixtures, electrical distribution, lighting, fire alarm, communications, and associated controls. Site improvements will consist of new asphalt and concrete paving, sidewalks, utility infrastructure, grease trap, oil and water separator, grading, irrigation systems, and landscaping necessary to support the overall development and operation of the facility. The project is located at 13041 Liberty Parkway, Vestavia Hills, 35242.

GC Bidding

$4,694,400.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
11
Bidding Soon
814
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

13041 Liberty Pkwy, Vestavia Hills, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.